COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
402473794
10/26/2020
1) This approval is good for one year and a new application must be made before 08/24/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. 3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
EngineerForm: (04)
402551285
04/12/2021
1) This approval is good for one year and a new application must be made before 01/09/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. 3) Correct production reporting from SI to TA from 9/2020 forward
EngineerForm: (04)
402903433
01/10/2022
1) This approval is good for one year and a new application must be made before 01/09/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. 3) Submit a WBD on a Form 4 Sundry and notify Area Engineer
EngineerForm: (04)
403210300
03/01/2023
Updated well classification to Observation Well. Used 11/04/2022 as date well is no longer an injector. Operator to report this well as AC (Active) on Form 7.
EngineerForm: (04)
404495792
01/07/2026
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations. 2) Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare. 3) If any pressure tests fail: Contact ECMC engineering prior to continuing operations. 4) All repair work shall be completed by 7/6/2026. 5) Submit a Form Form 5A, Completed Interval Report, within 30 days of work completion, to report the updated packer depth, if packer is set at different depth.
 
COGIS - Best Management Practice Results
No records to display.