Engineer | Form: (04 ) 402842236 10/19/2021 | 1) Submit Form 4 Sundry-Subsequent Well Operations (Rule 312) for casing repair plans and complete repair by 3/16/2022 |
Engineer | Form: (04 ) 402871262 11/16/2021 | 1) Submit a Form 4 Repair/Rule 312 Sundry prior to completing repair work including an operational procedure |
Engineer | Form: (04 ) 402921589 1/11/2022 | 1) Complete repair by 3/16/2022
2) Conduct a Bradenhead test following a 7 day build up period after completion of the repair
3) Report work completed with a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results
4) If wellbore geometry changes or cement work is executed, submit information on a Form 5
5) If a casing leak is identified, contact area engineer with repair plans
|