Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-081-07768Deal Gulch
4-16
GRMR OIL & GAS LLC
10524
PA
8/17/2018
WILDCAT
99999
MOFFAT  081
SWNE 16 5N90W 6
428535View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400333689
11/01/2012
1)COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED. 2)PRODUCTION CASING (OR INTERMEDIATE CASING IF USED) CEMENT TOP VERIFICATION BY CBL REQUIRED.
EngineerForm: (06)
401670080
06/26/2018
1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) Properly abandon flowlines as per Rule 1105. File electronic Form 42 once abandonment complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator shall submit a Flowline Report, Form 44.
 
COGIS - Best Management Practice Results
No records to display.