| Engineering Tech | Form: (04) 400501766 11/25/2013 | Well must pass a Mechanical Integrity Test or be plugged and abandoned by October 15, 2014. |
| Engineer | Form: (04) 401506190 03/14/2018 | This approval is good for one year and a new application must be made before January 8, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
| Engineer | Form: (04) 401907812 03/20/2019 | This approval is good for one year and a new application must be made before January 8, 2020(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. |
| Engineer | Form: (04) 402279314 09/08/2020 | Submit sundry for TA status in 2021 that has a firm and realistic plan for the well.
Perform a bradenhead test and submit a Form 17 prior to submittal of the next year’s request for continued TA status.
This approval is good for one year and a new application must be made before January 9, 2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
|
| Engineer | Form: (04) 402453079 04/19/2021 | This approval is good for one year and a new application must be made before April 14, 2022 (1 year from prior application). Updates for the planned utilization of the well must be included with the application.
A Form 5A, Completed Interval Report, is required to report all plugs currently downhole which isolate any perforated interval.
The Form 7, Operators Report of Monthly Operations, must correctly reflect the well status and dates reported on the Form 4, Sundry Notice-Request for Continued Temporarily Abandoned Status.
|
| OGLA | Form: (06) 402953839 02/11/2022 | Operator will implement measures to capture, combust, or control emissions to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public health, welfare and the environment. |
| Permit | Form: (06) 402953839 04/13/2022 | Submit Operator's Monthly Production Reports (Form 7) required for compliance with Rule 413 within 30 days
WMFKC missing 7/2019 and 9/2019 |
| Permit | Form: (06) 402953839 04/13/2022 | Reported "as drilled" GPS data is inaccurate. Submit accurate "as drilled" GPS data on Subsequent Report of Abandonment. GPS data must meet the requirements of Rule 216. |
| Engineer | Form: (06) 402953839 04/19/2022 | 1) Perform bradenhead test prior to MIRU if test has not been performed within six months of plugging. Submit results on Form 17. Contact area environmental protection specialist for sampling and analysis requirements if initial bradenhead pressure is greater than 25 psi.
2) Prior to placing the surface casing shoe plug: verify that all fluid migration (liquid and gas) has been eliminated. If evidence of fluid migration or pressure remains, contact COGCC Engineer for an update to plugging orders.
3) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations.
4) The approved Form 6, Notice of Intent will be at the location during all phases of plugging operations.
5) Properly abandon flowlines as per Rule 1105. Pursuant to Rule 911.a. Closure of Oil and Gas Facilities, Operator will submit Site Investigation and Remediation Workplans via Form 27 for COGCC prior approval before cutting and capping the plugged well, conducting flowline abandonment, and removing production equipment. Pursuant to Rule 1105.f. Abandonment Verification, within 90 days of an operator completing abandonment requirements for a flowline or crude oil transfer line, an operator must submit a Field Operations Notice, Form 42-Abandonment of Flowlines for on-location flowlines, and a Flowline Report, Form 44, for off-location flowlines or crude oil transfer lines.
|
| Reclamation Specialist | Form: (04) 403043125 09/08/2022 | Approval/Passing of the form 4 acknowledges that the Oil and Gas Conservation Commission has received the notice. It is not an acknowledgement that reclamation has been passed. A field inspection will be conducted at a future date to evaluate compliance with reclamation standards.
At a minimum, Final Reclamation shall be conducted in accordance with 1004.a requirements. |
| Reclamation Specialist | Form: (04) 403799524 07/24/2024 | Duplicate Form 4 to #403799126.
COAs per Sundry #403799126 apply. |