| Engineer | Form: (04) 400605546 05/15/2014 | (1) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED.
(2) SUBMIT NEW FORM 5A (COMPLETED INTERVAL REPORT) AND SUBMIT TO FRAC FOCUS TO DOCUMENT THE NEW MORRISON GROSS PERFORATED INTERVAL AND STIMULATION. |
| Permit | Form: (06) 402670758 05/18/2021 | Submit Operator's Monthly Production Reports (Form 7) required for compliance with Rule 413 within 30 days
Missing SNDC 9/2010,11/2012,5/2014,3/2021. Missing MRSN 3/2021 |
| Engineer | Form: (06) 402670758 05/28/2021 | 1) Perform bradenhead test prior to MIRU if test has not been performed within six months of plugging. Submit results on Form 17. Contact area environmental protection specialist for sampling and analysis requirements if initial bradenhead pressure is greater than 25 psi.
2) Provide 48 hour notice of plugging MIRU via electronic Form 42.
3) The approved Form 6, Notice of Intent will be at the location during all phases of plugging operations.
4) Properly abandon flowlines as per Rule 1105. File electronic Form 42 once on location abandonment complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator shall submit a Flowline Report, Form 44.
5) This well has federal minerals. Operator shall notify COGCC engineering staff of any plugging changes required by the BLM or unexpected conditions in the field as soon as feasible. |