Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-077-08269BIG CREEK
2-7 (PL7NE)
QB ENERGY OPERATING LLC
10844
PA
10/28/2018
PLATEAU
69300
MESA  077
NENE 7 10S95W 6
312461View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
401754592
09/14/2018
1)Provide 48 hour notice of plugging MIRU via electronic Form 42. 2)Check bradenhead pressure and perform a bradenhead test prior to MIRU if the pressure is greater than 50 psi. Submit results electronically on a Form 17 and contact COGCC Area Engineer. 3)Properly abandon flowlines as per Rule 1105. File electronic Form 42 once abandonment complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator shall submit a Flowline Report, Form 44. 4)Operator shall implement measures to control unnecessary and excessive venting, to protect the health and safety of the public, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
 
COGIS - Best Management Practice Results
No records to display.