| Engineer | Form: (02) 400507646 11/22/2013 | 1) Provide 48 hour notice prior to spud via electronic Form 42.
2) If production casing is set provide cement coverage to at least 200’ above the Marmaton and cement across Cheyenne/Dakota interval: (4770’-4210’ minimum). Run and submit CBL to verify cemented intervals.
3) If well is a dry hole set plugs at the following depths: 40 sks cement +/- 50’ above the Spergen, 40 sks cement +/- 50’ above the Morrow, 40 sks cement +/- 50’ above the Marmaton, 40 sks cement +/- 50’ above any DST w/ show, 40 sks cement at 4770’ up, 40 sks cement at 4210’ up, 50 sks cement from 50’ below surface casing shoe up into surface casing, 15 sks cement in top of surface casing, cut 4 ft below GL, weld on plate, 5 sks cement each in rat hole and mouse hole.
|
| Engineer | Form: (04) 400720069 01/22/2015 | 1) The venting or flaring of natural gas shall be conducted in accordance with COGCC Rule 912 for the initial production test period.
2) Notify the local emergency dispatch or the local governmental designee of any natural gas flaring.
3) If flaring will continue more than 6 months, submit updated requests to flare to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring.
4) The operator is required to obtain and maintain any required air permits from CDPHE.
5) The venting or flaring volumes shall be reported by Form 7, Operator’s Monthly Report of Operations.
|
| Engineer | Form: (04) 400982102 03/25/2016 | 1) Submit requests to flare annually to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring. Provide gas analysis including H2S with each Sundry Notice.
2) Venting or flaring of natural gas shall comply with COGCC Rule 912.
3) Report flaring volumes on Form 7, Operator’s Monthly Report of Operations.
4) Notify the local emergency dispatch or the local governmental designee of natural gas flaring.
5) The operator is required to obtain and maintain any required air permits from CDPHE. The combustion device must comply with applicable design destruction efficiency for hydrocarbons.
|