| Agency | Form: (02) 1784293 09/15/2009 | <style type="text/css">
p {margin:0px 0px 0px 2px;}
ul {margin-top:2px;margin-bottom:2px;}
ol {margin-top:2px;margin-bottom:2px;}
H1 {font-family:Arial;font-size:28px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;}
H2 {font-family:Arial;font-size:24px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;}
H3 {font-family:Arial;font-size:18px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;}
.Normal {font-family:Arial;font-size:14px;text-align:Left;vertical-align:Middle;color:#000000;}
.TableDefault {border-collapse:collapse;border:1px solid #000000;}
.TableDefault th {padding:2px;vertical-align:top;text-align:left;border:1px solid #000000;}
.TableDefault td {padding:2px;vertical-align:top;text-align:left;border:1px solid #000000;}
</style>
<p><span class="Normal">1) Provide 24 hour notice of MIRU to Mike Leonard at 719-767-2805 or e-mail at</span></p>
<p><span class="Normal">mike.leonard@ state.co.us. 2) If production casing is set provide cement coverage</span></p>
<p><span class="Normal">to at least 200’ above top potentially productive zone, and stage cement from 50’</span></p>
<p><span class="Normal">below Cheyenne to 50’ above Dakota (est. 4550’-4000’). Run CBL to verify</span></p>
<p><span class="Normal">primary and stage cement jobs. 3) If well is a dry hole set the following plugs: 40</span></p>
<p><span class="Normal">sks cement +/- 50’ above the Lansing, 40 sks cement above any DST zone, 40 sks</span></p>
<p><span class="Normal">cement 50’ below base of Cheyenne (est. 4550’ up), 40 sks cement at top of</span></p>
<p><span class="Normal">Cheyenne (est. 4350’ up), 40 sks cement 50’ above top of Dakota (est. 4050’ up),</span></p>
<p><span class="Normal">50 sks cement from 50’ below surface casing shoe up into surface casing, 10 sks</span></p>
<p><span class="Normal">cement in top of surface csg, cut 4 ft below GL, weld on plate, 5 sks cement in rat</span></p>
<p><span class="Normal">hole and mouse hole.</span></p>
|
| Permit | Form: (02) 400538330 02/04/2014 | Operator shall comply with Buffer Zone Move-In, Rig-Up Notice Policy dated 12-16-2013. |
| Permit | Form: (02) 400538330 02/04/2014 | Open hole resistivity and gamma logs shall be run to describe the stratigraphy of the entire well bore and to adequately verify the setting depth of surface casing and aquifer coverage. On a multi-well pad, these open hole logs are only required on one of the first wells drilled on the pad and the Drilling Completion Report - Form 5 for every well on the pad shall identify which well was logged. |
| Engineer | Form: (02) 403896924 10/08/2024 | Operator to submit a Form 5A to document new formation completion |
| Engineer | Form: (02) 403896924 10/08/2024 | Operator to control emissions and venting during flowback. |