Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-071-09943JACKSON
31 SENW 3054
BNL (ENTERPRISE) INC
10763
DG
2/18/2025
WILDCAT
99999
LAS ANIMAS  071
SENW 31 30S54W 6
488238View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
403961001
10/28/2024
1) Submit Form 42 electronically to ECMC 2 business days prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 2 business day spud notice via Form 42 for all subsequent wells drilled on the pad. 2) Comply with Rule 408.e. (2). Operator will isolate groundwater with fully-cemented surface casing. Verify coverage with a cement bond log.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
403961001
11/13/2024
The well be logged open hole from TD to 9 5/8 inch casing with a triple combo log suite. Additionally, a GR/CBL/Neutron will run inside 9 5/8 inch casing to surface.