| Engineer | Form: (02) 403675293 08/16/2024 | 1) Submit Form 42 electronically to ECMC 2 business days prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 2 business day spud notice via Form 42 for all subsequent wells drilled on the pad.
2) Comply with Rule 408.e. (2). Operator will isolate groundwater with fully-cemented surface casing. Verify coverage with a cement bond log. |
| Engineer | Form: (02) 403675293 08/16/2024 | Contacted Operator and updated BOPE option from 'None' to 'Rotating Head' on Form 2. Operator is to use a rotating head as the sealing device for the diverter. |