Engineer | Form: (02 ) 403357921 6/8/2023 | 1) Submit Form 42 electronically to COGCC 2 business days prior to MIRU (spud notice) for the first well activity with a rig on the pad.
2) If groundwater flow or hydrocarbon bearing zones are encountered during drilling, cement the production casing to 500' above the zone.
3) If dry hole, set minimum 100' plugs across the Lyons and Dakota formation tops and half-in half out of the surface casing shoe. |
Engineer | Form: (04 ) 403605915 7/30/2024 | Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations. |
Engineer | Form: (04 ) 403605915 7/30/2024 | For all Wells other than coalbed methane Wells, an Operator will perform an annual Bradenhead test and submit the data to the
Director on a Form 17 or other Director-approved method. |