Engineer | Form: (04 ) 400453134 12/20/2013 | 1) Submit Sundry Notice - Form 4 annually stating the method the well is closed to the atmosphere and plans for future operation.
2) Collect and report data including gas composition, pressure and flow rates annually. Record static shut-in pressure, collect & analyze representative gas sample (hydrocarbons C1-C10+, including BTEX, O2, CO2, N2, H2S), flow rate if venting.
3) Any venting of natural gas shall be conducted in accordance with COGCC Rule 912.
4) Obtain and maintain any required air permits from CDPHE.
5) Especially note following rules: Rule 319.b except MIT (well sign, migration of fluids - divert surface water, prevent uncontrolled venting around perimeter of slab). 600 series safety regulations (fencing, access, hazards, signs).
|
Engineer | Form: (04 ) 402066419 6/10/2020 | Perform a bradenhead test and submit a Form 17 prior to submittal of the next year’s request for continued TA status.
A new application must be made before July 6, 2020. Updates for the planned utilization of the well should be included with the application.
A Form 5A, Completed Interval Report, is required to report all plugs currently downhole which isolate any perforated interval.
The Form 7, Operators Report of Monthly Operations, must correctly reflect the well status and dates reported on the Form 4, Sundry Notice-Request for Continued Temporarily Abandoned Status.
|
Engineer | Form: (04 ) 402704173 7/9/2021 | 1) This approval is good for one year and a new application must be made before 05/28/2022 (1 year from prior application). Updates for the planned utilization of the well must be included with the application
2) Collect and report shut in pressure annually.
3) Venting of natural gas is not allowed per Rule 903.
4) The Form 7, Operators Report of Monthly Operations, must correctly reflect the well status and dates reported on the Form 4, Sundry Notice-Request for Continued Temporarily Abandoned Status.
|