Engineer | Form: (04 ) 400528339 1/2/2014 | Operator is granted request for discontinuance of further Bradenhead testing in accordance with Rule 608(e). |
Engineer | Form: (04 ) 402065791 6/10/2020 | Perform a bradenhead test and submit a Form 17 prior to submittal of the next year’s request for continued TA status.
A new application must be made before July 6, 2020. Updates for the planned utilization of the well should be included with the application.
A Form 5A, Completed Interval Report, is required to report all plugs currently downhole which isolate any perforated interval.
The Form 7, Operators Report of Monthly Operations, must correctly reflect the well status and dates reported on the Form 4, Sundry Notice-Request for Continued Temporarily Abandoned Status.
|
Engineer | Form: (04 ) 402623197 6/30/2021 | This approval is good for one year and a new application must be made before June 1, 2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
The Form 7, Operators Report of Monthly Operations, must correctly reflect the well status and dates reported on the Form 4, Sundry Notice-Request for Continued Temporarily Abandoned Status.
|