Agency | Form: (02 ) 1697657 5/3/2010 | 1) Provide 24 hour notice of MIRU to Ed Binkley at 970-506-9834 or e-mail at ed.binkley@state.co.us 2) Comply with Rule 317.i and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Run and submit Directional Survey from TD to base of surface casing. The operator shall comply with Rule 321, and it shall be the operator’s responsibility to ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well. |
Engineer | Form: (02 ) 2590331 11/30/2010 | CIBP SHOWN ABOVE MUDDY J - NEED 5A SUBMITTED FOR ABANDONMENT OF MUDDY J W/ CONTRACTOR'S SUMMARIES. |
Permit | Form: (04 ) 400464149 8/9/2013 | Operator must submit corrected production reports for this well. |