Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-067-09995East Sauls Creek 35
4-1
SIMCOE LLC
10749
AL
5/23/2025
IGNACIO BLANCO
38300
LA PLATA  067
NESE 34 35N6W N
325891View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
401173759
01/27/2017
1) If borehole problems occur while drilling and an unplanned sidetrack is required, the following shall apply: a.) Before proceeding, contact the COGCC Regional Engineer for SW Colorado for verbal approval and provide an explanation as to what happened to the original borehole and what the plan is for the sidetrack. Contact Information: Mark Weems – Regional Engineer-SW Colorado 970-259-4587 off 970-749-0624 cell mark.weems@state.co.us b.) Adhere to the instructions provided in the “UNPLANNED Sidetrack While Drilling: Approval and Reporting Process – Southwestern Colorado San Juan Basing ONLY” that can be found on the COGCC website at: Go to COGCC Web Site for more details if necessary Forms Form 2-Permit to Drill Instructions 2) Contact COGCC Regional Engineer – Mark Weems when encountering a well control issue, unexpected water flows, and unexpected Hydrogen Sulfide. 3) The two closest water wells within 1/4 mile radius of the proposed lateral shall be sampled & analyzed (Cause 112 Orders 156-157 and rule 608) if not done previously.
EngineerForm: (02)
401173787
01/27/2017
1) If borehole problems occur while drilling and an unplanned sidetrack is required, the following shall apply: a.) Before proceeding, contact the COGCC Regional Engineer for SW Colorado for verbal approval and provide an explanation as to what happened to the original borehole and what the plan is for the sidetrack. Contact Information: Mark Weems – Regional Engineer-SW Colorado 970-259-4587 off 970-749-0624 cell mark.weems@state.co.us b.) Adhere to the instructions provided in the “UNPLANNED Sidetrack While Drilling: Approval and Reporting Process – Southwestern Colorado San Juan Basing ONLY” that can be found on the COGCC website at: Go to COGCC Web Site for more details if necessary Forms Form 2-Permit to Drill Instructions 2) Contact COGCC Regional Engineer – Mark Weems when encountering a well control issue, unexpected water flows, and unexpected Hydrogen Sulfide. 3) The two closest water wells within 1/4 mile radius of the proposed lateral shall be sampled & analyzed (Cause 112 Orders 156-157 and rule 608) if not done previously.
EngineerForm: (02)
401173760
01/27/2017
1) If borehole problems occur while drilling and an unplanned sidetrack is required, the following shall apply: a.) Before proceeding, contact the COGCC Regional Engineer for SW Colorado for verbal approval and provide an explanation as to what happened to the original borehole and what the plan is for the sidetrack. Contact Information: Mark Weems – Regional Engineer-SW Colorado 970-259-4587 off 970-749-0624 cell mark.weems@state.co.us b.) Adhere to the instructions provided in the “UNPLANNED Sidetrack While Drilling: Approval and Reporting Process – Southwestern Colorado San Juan Basing ONLY” that can be found on the COGCC website at: Go to COGCC Web Site for more details if necessary Forms Form 2-Permit to Drill Instructions 2) Contact COGCC Regional Engineer – Mark Weems when encountering a well control issue, unexpected water flows, and unexpected Hydrogen Sulfide. 3) The two closest water wells within 1/4 mile radius of the proposed lateral shall be sampled & analyzed (Cause 112 Orders 156-157 and rule 608) if not done previously.
EngineerForm: (02)
401173803
01/27/2017
1) If borehole problems occur while drilling and an unplanned sidetrack is required, the following shall apply: a.) Before proceeding, contact the COGCC Regional Engineer for SW Colorado for verbal approval and provide an explanation as to what happened to the original borehole and what the plan is for the sidetrack. Contact Information: Mark Weems – Regional Engineer-SW Colorado 970-259-4587 off 970-749-0624 cell mark.weems@state.co.us b.) Adhere to the instructions provided in the “UNPLANNED Sidetrack While Drilling: Approval and Reporting Process – Southwestern Colorado San Juan Basing ONLY” that can be found on the COGCC website at: Go to COGCC Web Site for more details if necessary Forms Form 2-Permit to Drill Instructions 2) Contact COGCC Regional Engineer – Mark Weems when encountering a well control issue, unexpected water flows, and unexpected Hydrogen Sulfide. 3) The two closest water wells within 1/4 mile radius of the proposed lateral shall be sampled & analyzed (Cause 112 Orders 156-157 and rule 608) if not done previously.
EngineerForm: (02)
403047622
08/26/2022
1)The First String (7” casing) shall be cemented from the casing shoe to the surface by circulation methods. Verify production casing cement coverage with a cement bond log. 2) The two closest water wells within 1/4 mile radius of the proposed lateral shall be sampled & analyzed (Cause 112 Orders 156-157 and rule 615) if not done previously. 3) If borehole problems occur while drilling and an unplanned sidetrack is required, the following shall apply: a.) Before proceeding, contact the COGCC Engineer for verbal approval and provide an explanation as to what happened to the original borehole and what the plan is for the sidetrack. Contact Information: Alicia Duran – Area Engineer 303-548-7396 cell alicia.duran@state.co.us b.) Adhere to the instructions provided in the “UNPLANNED Sidetrack While Drilling: Approval and Reporting Process – Statewide” that can be found on the COGCC website at: Go to COGCC Web Site for more details if necessary Regulation, Forms, Form 2-Permit to Drill, Instructions 4) Contact COGCC Engineer – Alicia Duran when encountering kicks requiring a mud weight increase of 0.5 ppg to control the kick, unexpected water flows, and unexpected Hydrogen Sulfide.
EngineerForm: (02)
403050468
08/26/2022
1)The First String (7” casing) shall be cemented from the casing shoe to the surface by circulation methods. Verify production casing cement coverage with a cement bond log. 2) The two closest water wells within 1/4 mile radius of the proposed lateral shall be sampled & analyzed (Cause 112 Orders 156-157 and rule 615) if not done previously. 3) If borehole problems occur while drilling this sidetrack and an additional unplanned sidetrack is required, the following shall apply: a.) Before proceeding, contact the COGCC Engineer for verbal approval and provide an explanation as to what happened to the original borehole and what the plan is for the sidetrack. Contact Information: Alicia Duran – Area Engineer 303-548-7396 cell alicia.duran@state.co.us b.) Adhere to the instructions provided in the “UNPLANNED Sidetrack While Drilling: Approval and Reporting Process – Statewide” that can be found on the COGCC website at: Go to COGCC Web Site for more details if necessary Regulation, Forms, Form 2-Permit to Drill, Instructions 4) Contact COGCC Engineer – Alicia Duran when encountering kicks requiring a mud weight increase of 0.5 ppg to control the kick, unexpected water flows, and unexpected Hydrogen Sulfide.
EngineerForm: (02)
403050745
08/26/2022
1)The First String (7” casing) shall be cemented from the casing shoe to the surface by circulation methods. Verify production casing cement coverage with a cement bond log. 2) The two closest water wells within 1/4 mile radius of the proposed lateral shall be sampled & analyzed (Cause 112 Orders 156-157 and rule 615) if not done previously. 3) If borehole problems occur while drilling this sidetrack and an additional unplanned sidetrack is required, the following shall apply: a.) Before proceeding, contact the COGCC Engineer for verbal approval and provide an explanation as to what happened to the original borehole and what the plan is for the sidetrack. Contact Information: Alicia Duran – Area Engineer 303-548-7396 cell alicia.duran@state.co.us b.) Adhere to the instructions provided in the “UNPLANNED Sidetrack While Drilling: Approval and Reporting Process – Statewide” that can be found on the COGCC website at: Go to COGCC Web Site for more details if necessary Regulation, Forms, Form 2-Permit to Drill, Instructions 4) Contact COGCC Engineer – Alicia Duran when encountering kicks requiring a mud weight increase of 0.5 ppg to control the kick, unexpected water flows, and unexpected Hydrogen Sulfide.
EngineerForm: (02)
403050832
08/26/2022
1)The First String (7” casing) shall be cemented from the casing shoe to the surface by circulation methods. Verify production casing cement coverage with a cement bond log. 2) The two closest water wells within 1/4 mile radius of the proposed lateral shall be sampled & analyzed (Cause 112 Orders 156-157 and rule 615) if not done previously. 3) If borehole problems occur while drilling this sidetrack and an additional unplanned sidetrack is required, the following shall apply: a.) Before proceeding, contact the COGCC Engineer for verbal approval and provide an explanation as to what happened to the original borehole and what the plan is for the sidetrack. Contact Information: Alicia Duran – Area Engineer 303-548-7396 cell alicia.duran@state.co.us b.) Adhere to the instructions provided in the “UNPLANNED Sidetrack While Drilling: Approval and Reporting Process – Statewide” that can be found on the COGCC website at: Go to COGCC Web Site for more details if necessary Regulation, Forms, Form 2-Permit to Drill, Instructions 4) Contact COGCC Engineer – Alicia Duran when encountering kicks requiring a mud weight increase of 0.5 ppg to control the kick, unexpected water flows, and unexpected Hydrogen Sulfide.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
401173759
4/28/2017
An open-hole resistivity/gamma ray log was already run on the first well drilled on this pad (Yankee Federal B 1 – API 05-067-07127 – Doc ID 960790). The intermediate string for the pilot hole on this multi-well location will be logged with a cement bond log with cased-hole gamma-ray log from above the planned upper-most window into the surface casing.
Drilling/Completion OperationsForm: (02 )
401173759
4/28/2017
Anti-collision evaluation was performed. Offset wells are operated by BP.
Drilling/Completion OperationsForm: (02 )
401173787
4/28/2017
Note: Laterals are not logged. Only pilot holes are logged as follows: An open-hole resistivity/gamma ray log was already run on the first well drilled on this pad (Yankee Federal B 1 – API 05-067-07127 – Doc ID 960790). The intermediate string for the pilot hole on this multi-well location will be logged with a cement bond log with cased-hole gamma-ray log from above the planned upper-most window into the surface casing.
Drilling/Completion OperationsForm: (02 )
401173760
4/28/2017
Note: Laterals are not logged. Only pilot holes are logged as follows: An open-hole resistivity/gamma ray log was already run on the first well drilled on this pad (Yankee Federal B 1 – API 05-067-07127 – Doc ID 960790). The intermediate string for the pilot hole on this multi-well location will be logged with a cement bond log with cased-hole gamma-ray log from above the planned upper-most window into the surface casing.
Drilling/Completion OperationsForm: (02 )
401173803
4/28/2017
Note: Laterals are not logged. Only pilot holes are logged as follows: An open-hole resistivity/gamma ray log was already run on the first well drilled on this pad (Yankee Federal B 1 – API 05-067-07127 – Doc ID 960790). The intermediate string for the pilot hole on this multi-well location will be logged with a cement bond log with cased-hole gamma-ray log from above the planned upper-most window into the surface casing.
Drilling/Completion OperationsForm: (02 )
401173760
4/28/2017
Anti-collision evaluation was performed. Offset wells are operated by BP.
Drilling/Completion OperationsForm: (02 )
401173803
4/28/2017
Anti-collision evaluation was performed. Offset wells are operated by BP.
Drilling/Completion OperationsForm: (02 )
401173787
4/28/2017
Anti-collision evaluation was performed. Offset wells are operated by BP.
Drilling/Completion OperationsForm: (02 )
403047622
9/8/2022
An open-hole resistivity/gamma ray log was already run on the first well drilled on this pad (Yankee Federal B 1 – API 05-067-07127 – Doc ID 960790). The intermediate string for the pilot hole on this multi-well location will be logged with a cement bond log with cased-hole gamma-ray log from above the planned upper-most window into the surface casing.
Drilling/Completion OperationsForm: (02 )
403047622
9/8/2022
Anti-collision evaluation was performed. Offset wells are operated by SIMCOE.
Drilling/Completion OperationsForm: (02 )
403050468
9/8/2022
Note: Laterals are not logged. Only pilot holes are logged as follows: An open-hole resistivity/gamma ray log was already run on the first well drilled on this pad (Yankee Federal B 1 – API 05-067-07127 – Doc ID 960790). The intermediate string for the pilot hole on this multi-well location will be logged with a cement bond log with cased-hole gamma-ray log from above the planned upper-most window into the surface casing.
Drilling/Completion OperationsForm: (02 )
403050468
9/8/2022
Anti-collision evaluation was performed. Offset wells are operated by SIMCOE.
Drilling/Completion OperationsForm: (02 )
403050745
9/8/2022
Note: Laterals are not logged. Only pilot holes are logged as follows: An open-hole resistivity/gamma ray log was already run on the first well drilled on this pad (Yankee Federal B 1 – API 05-067-07127 – Doc ID 960790). The intermediate string for the pilot hole on this multi-well location will be logged with a cement bond log with cased-hole gamma-ray log from above the planned upper-most window into the surface casing.
Drilling/Completion OperationsForm: (02 )
403050745
9/8/2022
Anti-collision evaluation was performed. Offset wells are operated by SIMCOE.
Drilling/Completion OperationsForm: (02 )
403050832
9/8/2022
Note: Laterals are not logged. Only pilot holes are logged as follows: An open-hole resistivity/gamma ray log was already run on the first well drilled on this pad (Yankee Federal B 1 – API 05-067-07127 – Doc ID 960790). The intermediate string for the pilot hole on this multi-well location will be logged with a cement bond log with cased-hole gamma-ray log from above the planned upper-most window into the surface casing.
Drilling/Completion OperationsForm: (02 )
403050832
9/8/2022
Anti-collision evaluation was performed. Offset wells are operated by SIMCOE.