| Engineer | Form: (06) 400587256 06/11/2014 | 1) Notify COGCC regional engineer 48 hrs prior to MIRU at mark.weems@state.co.us or 970-259-4587.
2) Purge the flow lines, cut off 3’-4’ deep, and cap. Remember to note on form 6, page two under the Additional Plugging Information for Subsequent Report Only. (COGCC Rule 1103)
3) Prior to killing the well, measure the surface casing pressure (Braden Head) and then blow it down. Continue to monitor the surface casing pressure throughout the PA.
4) Leave a vent hole in casing/marker to avoid trapping any residual pressure in the casing(s)
|