COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400956578
01/08/2016
1) Operator shall comply with the most current revision of the Northwest Notification Policy. 2) Operator shall provide cement coverage from the production casing shoe (5+1/2" First String) to a minimum of 200' above the surface casing shoe to provide full isolation of the Coalmont Formation. Verify production casing cement coverage with a cement bond log. Changed First String cement top from a null value to 2300' (200' above proposed surface casing shoe depth of 2500').
EngineerForm: (04)
401146593
11/22/2016
1) Comply with all requirements of Rule 912, including monthly reporting of flared volumes (on Form 7) and notifications to local emergency dispatch or the local government designee. 2) Submit annual updates (requests to flare) to COGCC on Form 4s (Sundry Notices),including all information specified in COGCC’s "Notice to Operators, Rule 912 Venting or Flaring Produced Natural Gas - Statewide." 3) Comply with any Colorado Department of Public Health and Environment, Air Pollution Control Division rules or requirements for all atmospheric discharges. 4) An enclosed flare shall be used, unless an open flare is specifically allowed by CDPHE’s Regulation 7.
EngineerForm: (04)
401423527
10/17/2017
1) Comply with all requirements of Rule 912, including monthly reporting of flared volumes (on Form 7) and notifications to local emergency dispatch or the local government designee. 2) Submit annual updates (requests to flare) to COGCC on Form 4s (Sundry Notices),including all information specified in COGCC’s "Notice to Operators, Rule 912 Venting or Flaring Produced Natural Gas - Statewide." 3) Comply with any Colorado Department of Public Health and Environment, Air Pollution Control Division rules or requirements for all atmospheric discharges. 4) An enclosed flare shall be used, unless an open flare is specifically allowed by CDPHE’s Regulation 7. 5) With next years annual update (request to flare), collect a new gas sample including hydrogen sulfide and submit an Electronic Data Deliverable (EDD), prepared by the laboratory that performed the gas analysis. The EDD shall be submitted with the annual update, in the format specified on COGCC’s website, located in Help => Environmental => COGCC EDD Information.
EngineerForm: (04)
401833513
02/22/2019
1) Comply with all requirements of Rule 912, including monthly reporting of flared volumes (on Form 7) and notifications to local emergency dispatch or the local government designee. 2) Submit annual updates (requests to flare) to COGCC on Form 4s (Sundry Notices), including all information specified in COGCC’s "Notice to Operators, Rule 912 Venting or Flaring Produced Natural Gas - Statewide." 3) Comply with any Colorado Department of Public Health and Environment, Air Pollution Control Division rules or requirements for all atmospheric discharges. 4) An enclosed flare shall be used, unless an open flare is specifically allowed by CDPHE’s Regulation 7. 5) With the next annual update (request to flare), collect a new gas sample for laboratory analysis including hydrogen sulfide and submit a Form 43 to upload the laboratory results to the COGCC Environmental Database. Form 43 instructions are on COGCC’s website under Regulation => Forms => Form 43 COGCC Environmental Database.
EngineerForm: (04)
402292729
02/12/2020
1) Comply with all requirements of Rule 912, including monthly reporting of flared volumes (on Form 7) and notifications to local emergency dispatch or the local government designee. 2) Submit annual updates (requests to flare) to COGCC on Form 4s (Sundry Notices), including all information specified in COGCC’s "Notice to Operators, Rule 912 Venting or Flaring Produced Natural Gas - Statewide." Next sundry request due 1/23/2021. 3) Comply with any Colorado Department of Public Health and Environment, Air Pollution Control Division rules or requirements for all atmospheric discharges. 4) An enclosed flare shall be used, unless an open flare is specifically allowed by CDPHE’s Regulation 7. 5) With the next annual update (request to flare), collect a new gas sample for laboratory analysis including hydrogen sulfide and submit a Form 43 to upload the laboratory results to the COGCC Environmental Database. Form 43 instructions are on COGCC’s website
EngineerForm: (04)
402522775
01/27/2021
Following the anticipated acquisition of certain assets owned and operated by SandRidge Energy in Jackson County, Colorado, SandRidge acknowledges Gondola Resources plans to modify SandRidge’s pending Gas Capture Plan for the Castle 0780 1-17H20 well and the six additional wells on the Mutual Pad. Gondola will install one natural gas-powered CAT driven 400 KW generator at the Mutual Pad and use natural gas from the wells to power the engines on the pad. This work is expected to commence in the Spring of 2021 and conclude in the Summer of 2021. Remaining gas volumes will be routed to the Big Horn Pad where Gondola will be installing a mobile data center and energy intensive computing facilities located on the Bighorn Pad. Gondola anticipates this arrangement to be deployed and operational by year end.
EngineerForm: (04)
402522775
01/29/2021
1) Flaring of natural gas shall comply with COGCC Rule 903. 2) Report metered volumes on Form 7, Operator’s Monthly Report of Operations for gas flared, sold or used on location. 3) The operator is required to obtain and maintain any required air permits from CDPHE. 4) The expectation for permanent flares controlling separators or residual gas will be an enclosed combustion device with a 98% design destruction efficiency for hydrocarbons. Operator shall manage this well so that production volumes do not exceed the combustor capacity. 5) Operator is to provide prior notification to the local emergency dispatch or the local governmental designee of any flaring or venting event. Operator shall have an approved a Gas Capture Plan or have sought and received a variance from the COGCC Commission for continued production without gas infrastructure, prior to January 15, 2022 or wells must be shut in by January 15, 2022.
EnvironmentalForm: (04)
402891280
12/10/2021
Because the Form 9 -Transfer of Ownership has not been approved by COGCC Staff, the operator’s Form 43(s) for this well will be due 30 days from the date the Form 9 is approved.
EngineerForm: (04)
403064954
03/30/2023
Bradenhead test results, 5/12/22 - SCP=12 down to 0 psi, gas flow, samples=none 12/22/22 - SCP=2 down to 0 psi, no flow Submit sundry as specified in plan contained herein, to have been submitted following 6 month period ending 12/1/22, with the results of monthly blow downs, volume estimates and sample analysis. Continue the monthly blowdowns and repeat the Bradenhead test by 6/1/23 and submit results of test and future plans by 7/1/2023.
EngineerForm: (04)
403455482
07/11/2023
Based on the attached reporting no further action required. Operator shall continue with monthly monitoring and annual bradenhead testing.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
400956578
2/17/2016
One of the first wells drilled on the pad will be logged with open-hole Resistivity Log and Gamma Ray Log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state “No open-hole logs were run” and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run.
Drilling/Completion OperationsForm: (02 )
402024796
9/26/2019
Alternative Logging Program: One of the first wells drilled on the pad will be logged with Open Hole Resistivity Log and Gamma Ray Log from the kick-off point to into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state "Alternative Logging Program - No open-hole logs were run" and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run."