| General Housekeeping | Form: (02 ) 400652662 10/31/2014 | Fence the well site after drilling to restrict public and wildlife access.
Keep well site location, road and the pipeline easement free of noxious weeds, litter
and debris.
Spray for noxious weeds and implement dust control, as needed.
Operator will not permit the release or discharge of any toxic or hazardous chemicals
or wastes on Owner’s Land.
Construct and maintain gates where any roads used by operator, its employees, or
contractors cross through fences on the leased premises. |
| Wildlife | Form: (02 ) 400652662 10/31/2014 | Where oil and gas activities must occur within the greater sage grouse leks or within
other mapped greater sage grouse breeding or summer habitat, Operator will conduct
these activities outside the period between March 1 and June 30.
Restrict post development well site visitations to portions of the day between 9:00 am
and 4:00 pm during the lekking season (March 1 to May 15).
Use hospital grade mufflers for compressors, pump jacks or other motors necessary to
run operations at the site. Mufflers will be pointed upward to dissipate potential
vibration.
Establish company guidelines to minimize wildlife mortality from vehicle collisions on
roads. Slow speeds and increased awareness among employees and contractors
should lessen impacts to wildlife.
Install and utilize bear-proof dumpsters and trash receptacles for all food-related trash
on location, following COGCC Rule 1204.a.(1). |
| Storm Water/Erosion Control | Form: (02 ) 400652662 10/31/2014 | Use water bars and other measures to prevent erosion and non-source pollution.
Implement and maintain BMPs to control storm water runoff in a manner that
minimizes erosion, transport of sediment offsite, and site degradation.
Co-locate gas and water gathering lines whenever feasible and mitigate any erosion
problems that arise due to the construction of any pipeline(s). |
| Construction | Form: (02 ) 400652662 10/31/2014 | Remove only the minimum amount of vegetation necessary for the construction of
roads and facilities.
Conserve topsoil during excavation and reuse as cover on disturbed areas to facilitate
regrowth of vegetation.
No construction or routine maintenance activities will be performed during periods
when the soil is too wet to adequately support construction equipment. |
| Noise mitigation | Form: (02 ) 400652662 10/31/2014 | The drill site is far enough away from any building units that noise mitigation will not be
required. |
| Drilling/Completion Operations | Form: (02 ) 400652662 10/31/2014 | A closed-loop drilling mud system will be used to preclude the use of an earthen
reserve pit when available. Light Sources will likewise be directed downwards and
away from occupied structures, where possible. Once the drilling and completion rigs
leave the site, there will be no permanently installed lighting on site. |
| Interim Reclamation | Form: (02 ) 400652662 10/31/2014 | Utilize only such area around each producing well as is reasonably necessary.
Restore the remainder of the well site location to its original condition within a
reasonable time after the completion of operations.
All reseeding shall be done with grasses consistent with the Rocky Mountain native
mix or other grasses reasonably requested by surface owner and during planting
period suggested by Owner. |
| Final Reclamation | Form: (02 ) 400652662 10/31/2014 | All surface restoration shall be accomplished to the satisfaction of Owner.
All reseeding shall be done with grasses consistent with the Rocky Mountain native
mix or other grasses reasonably requested by surface owner and during planting
period suggested by Owner.
Final reclamation shall be completed to the reasonable satisfaction of the Owner as
soon as practical after installation (weather permitting) and in accordance with
regulatory agency standards (BLM/COGCC). |