WELL05-045-22549Federal RU
434-6
TEP ROCKY MOUNTAIN LLC
96850
PR
11/8/2015
RULISON
75400
GARFIELD  045
SWSE 6 7S93W 6
335044View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400655972
08/28/2014
(1) Compliance with the most current revision of the northwest Colorado notification policy is required. See attached notice. (2) Compliance with the most current revision of the Garfield County Rulison field notice to operators is required, with the following exception: all field notice requirements specified in this notice to operators are superseded by the requirements of the most current revision of the northwest Colorado notification policy (see Condition Of Approval #1). See attached notice. (3) Compliance with the most current revision of the Mamm Creek Field Notice to Operators is required, with the following exception: all field notice requirements specified in this notice to operators are superseded by the requirements of the most current revision of the northwest Colorado notification policy (see Condition Of Approval #1). See attached notice. (4) Compliance with the notice to operators drilling wells in the Buzzard, Mamm Creek, and Rulison Fields, Garfield County and Mesa County is required. (Procedures and Submittal Requirements for Compliance with COGCC Orders Nos. 1-107, 139-56, 191-22, and 369-2 (July 8, 2010)). (5) Cement on production casing must be a minimum of 200' above the top of the Mesa Verde Formation (or 200' above the Ohio Creek Formation if present). Cement top verification by CBL is required. This requirement shall supersede the top of cement requirements in the Mamm Creek Field Notice to Operators.
EngineerForm: (02)
400899743
09/15/2015
Conditions of Approval from the original Form 2 remain unchanged for this sidetrack: (1) Compliance with the most current revision of the northwest Colorado notification policy is required. See attached notice. (2) Compliance with the most current revision of the Garfield County Rulison field notice to operators is required, with the following exception: all field notice requirements specified in this notice to operators are superseded by the requirements of the most current revision of the northwest Colorado notification policy (see Condition Of Approval #1). See attached notice. (3) Compliance with the most current revision of the Mamm Creek Field Notice to Operators is required, with the following exception: all field notice requirements specified in this notice to operators are superseded by the requirements of the most current revision of the northwest Colorado notification policy (see Condition Of Approval #1). See attached notice. (4) Compliance with the notice to operators drilling wells in the Buzzard, Mamm Creek, and Rulison Fields, Garfield County and Mesa County is required. (Procedures and Submittal Requirements for Compliance with COGCC Orders Nos. 1-107, 139-56, 191-22, and 369-2 (July 8, 2010)). (5) Cement on production casing must be a minimum of 200' above the top of the Mesaverde Formation (or 200' above the Ohio Creek Formation if present). Cement top verification by CBL is required. This requirement shall supersede the top of cement requirements in the Mamm Creek Field Notice to Operators.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02 )
400655972
10/31/2014
WPX will run triple-combo open hole logs from well TD up to base of surface casing on one of the first wells drilled on a multi-well pad. Remaining wells on the pad will be logged with either cased hole pulsed neutron or triple-combo open hole. Every well will also have a CBL log from well TD up through well surface. Form 5 Completion Reports will identify wells on the pad with triple-combo open hole logs.
PlanningForm: (02 )
400899743
9/17/2015
Mesaverde/Williams Fork Wells/Iles WPX will run triple-combo open hole logs from well TD up to base of surface casing on one of the first wells drilled on a multi-well pad. Remaining wells on the pad will be logged with either cased hole pulsed neutron or triple-combo open hole. Every well will also have a CBL log from well TD up through well surface. Form 5 Completion Reports will identify wells on the pad with triple-combo open hole logs.
PlanningForm: (02 )
400899743
9/17/2015
Maximize the utility of surface facilities by developing multiple wells from a single pad (directional drilling), and by co-locating multipurpose facilities (for example, well pads and compressors) to avoid unnecessary habitat fragmentation and disturbance of additional geographic areas. Avoid constructing any road segment in the channel of an intermittent or perennial stream Minimize the number, length, and footprint of oil and gas development roads Use existing roads where possible Combine and share roads to minimize habitat fragmentation Maximize the use of directional drilling to minimize habitat loss/fragmentation Maximize use of long-term centralized tank batteries to minimize traffic Maximize use of remote completion/frac operations to minimize traffic Maximize use of remote telemetry for well monitoring to minimize traffic Phase and concentrate development activities, so that large areas of undisturbed habitat for wildlife remain. Maintain undeveloped areas within development boundaries sufficient to allow wildlife to persist within development boundaries during all phases of construction, drilling, and production. Minimize the duration of development and avoid repeated or chronic disturbance of developed areas. Complete all anticipated drilling within a phased, concentrated, development area during a single, uninterrupted time period.
ConstructionForm: (02 )
400899743
9/17/2015
Structures for perennial or intermittent stream channel crossings should be constructed using appropriately sized bridges or Culverts. Design road crossings of streams at right angles to all riparian corridors and streams to minimize the area of disturbance to the extent possible.
Drilling/Completion OperationsForm: (02 )
400899743
9/17/2015
Use centralized hydraulic fracturing operations. Install and maintain adequate measures to exclude all types of wildlife (e.g., big game, birds, and small rodents) from all fluid pits (e.g., fencing, netting, and other appropriate exclusion measures). Conduct well completions with drilling operations to limit the number of rig moves and traffic.
Interim ReclamationForm: (02 )
400899743
9/17/2015
Remove well pad and road surface materials that are incompatible with post-production land use and re-vegetation Requirement Use only certified weed-free native seed in seed mixes, except for non-native plants that benefit wildlife WPX Energy will use certified, weed free grass hay, straw, hay or other mulch materials used for the reseeding and reclamation of disturbed areas. Install exclusionary devices to prevent bird and other wildlife access to equipment stacks, vents and openings. Reduce visits to well-sites through remote monitoring (i.e. SCADA) and the use of multi-function contractors.