Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-045-22176Clough
RWF 911-28D
TEP ROCKY MOUNTAIN LLC
96850
IJ
9/1/2025
RULISON
75400
GARFIELD  045
SESW 21 6S94W 6
335244View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400475674
09/30/2013
(1) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED. (2) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE GARFIELD COUNTY RULISON-FIELD NOTICE TO OPERATORS IS REQUIRED. (3) CEMENT ON PRODUCTION CASING MUST BE A MINIMUM OF 200’ ABOVE THE TOP OF THE MESA-VERDE FORMATION (OR 200’ ABOVE THE OHIO CREEK FORMATION IF PRESENT). CEMENT TOP VERIFICATION BY CBL IS REQUIRED. (4) APPROVAL OF THIS FORM DOES NOT AUTHORIZE INJECTION. AUTHORIZATION TO INJECT REQUIRES APPROVAL OF FORM 31 AND FORM 33. (5) BEFORE STIMULATING THE WELL, CAPTURE A WATER SAMPLE AND ANALYZE FOR TOTAL DISSOLVED SOLIDS. SUBMIT LAB ANALYSIS TO DENISE.ONYSKIW@STATE.CO.US (6) PRIOR APPROVAL OF FORM 4 IS REQUIRED FOR STEP RATE AND INJECTIVITY TESTS.
PermitForm: (05)
400540283
01/22/2014
Return to Draft: at operator's request.
UICForm: (04)
400636636
07/01/2014
Garrett Stacey, WPX, explained that the 2nd packer assembly would be approximately 8 ft. long. 2nd packer must be set within 1 or 2 casing joints of existing packer this will be acceptable. Discussed this WPX plan with Stuart Ellsworth and as long as 2nd packer is in close proximity to the top of the first packer the plan is acceptable.
EngineerForm: (04)
403352624
03/30/2023
1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report 2) At least once a year shut in bradenhead for 7 days or until the pressure reaches the bradenhead threshold and perform a bradenhead test. Report results on a Form 17, as specified in Rule 420 or other Director approved submittal method. 3) Comply with any CDPHE, Air Pollution Control Division rules or requirements for all atmospheric discharges. 4) Any liquids blown down are to be collected, stored, handled, and treated or disposed as E&P waste per COGCC’s 900 series rules. 5) At least one check valve is required for annular spaces that are tied to sales line or separator. Maintain equipment for pressure regulation and check valves in good working order. 6) At least one valve is required to monitor pressure and sample flow from the bradenhead. 7) Within 30 days of completing the work, submit a Form 4 Subsequent Report - Bradenhead Plan
 
COGIS - Best Management Practice Results
No records to display.