| Engineer | Form: (02) 400291432 07/06/2012 | 1) THE PROPOSED SURFACE CASING IS MORE THAN 50' BELOW THE DEPTH OF THE DEEPEST WATER WELL WITHIN 1MILE OF THE SURFACE LOCATION WHEN CORRECTED FOR ELEVATION DIFFERENCES. THE DEEPEST WATER WELL WITHIN 1 MILE IS 265 FEET DEEP.
2) CEMENT TOP ON PRODUCTION CASING MUST BE AT LEAST 200’ ABOVE THE TOP OF THE MESA VERDE |