| UIC | Form: (04) 401696124 07/16/2018 | Operator has permission to defer collecting 5-year water sample and performing analysis until well is returned to injection. Sampling and analysis required within 30 days of when well returned to injection. |
| Engineer | Form: (04) 403219686 11/28/2022 | 1) At the conclusion of the 6 months from BH test date (2/29/23), submit a Form 4 BHP Sundry that summarizes current well condition. The sundry should include details of the future plans, flow information, number of times well was blown down, pressure data and a discussion of the abatement history for the previous 6 months. Please include the proposed pressure mitigation plan in the sundry.
2) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report
3) Submit a current WBD on a Form 4 Sundry “COMPLIANCE with CONDITION OF APPROVAL (COA)” by 03/31/23 |