| Engineer | Form: (04) 403534666 11/15/2023 | 1)Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report or other Director approved submittal method.
2)Comply with any CDPHE, Air Pollution Control Division rules or requirements for all atmospheric discharges.
3)Complete installation of BH monitoring system as soon as parts are available
|
| Engineer | Form: (04) 403675748 02/18/2025 | 1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. By 5/8/2025 , conduct a new bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans, , and the flow rate information and pressure data.
Provide additional diagnostics on intermediate and production casing pressures
3. Operator will implement measures to get an initial estimate of the gas flow rate and/or volume from the bradenhead. During the shut-in period record pressure data to adequately characterize the build-up.
4. If a sample has not been collected from intermediate and production casing within the last twelve months collect bradenhead gas samples for laboratory analysis. Sampling will comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results will be provided to the ECMC within three months of collecting the samples.
|