| Engineer | Form: (04) 401928707 12/26/2019 | This approval is good for one year and a new application must be made before 2/4/2020 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. Provide further details on when the location will become availble.
The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
|