| Engineer | Form: (04) 402515332 10/21/2020 | 1) Conduct an MIT within 30 days of temporary abandonment and submit a form 21
2) Submit a form 4 TA sundry once well is temorarily abandoned
3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. |
| Engineer | Form: (04) 402698259 05/26/2021 | 1)This approval is good for one year and a new application must be made before 12/18/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2)The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. Correct production reporting for 1/2021 and 2/2022 to TA. |
| Engineer | Form: (04) 402896650 02/09/2022 | 1) This approval is good for one year and a new application must be made before 12/18/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. |