COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400191336
08/08/2011
(1) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED.
EngineerForm: (02)
400728641
11/19/2014
1)Operator shall comply with the most current revision of the Northwest Colorado Notification Policy. See attached notice.
OGLAForm: (06)
403006324
05/11/2022
Operator will implement measures to capture, combust, or control emissions to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public health, welfare and the environment.
OGLAForm: (06)
403006324
05/11/2022
This oil and gas location is within a CPW-mapped Greater-Sage Grouse lek site area. Plugging and abandonment (PA) activities should not take place from March 1 to July 15. If site conditions warrant that PA activities must occur from March 1 to July 15, and are within 1.0-mile of an active lek site, Operator will consult with CPW to develop measures to avoid, minimize, and mitigate impacts to wildlife.
PermitForm: (06)
403006324
06/01/2022
Submit Operator's Monthly Production Reports (Form 7) required for compliance with Rule 413 within 30 days Cozzette/Corcoran missing from 4/2010-Current
PermitForm: (06)
403006324
06/01/2022
Submit a form 5A to report perforation interval 10864-10875 for Sego formation identified on the wellbore diagram attached to the Notice of Intent. This Form 5A must be submitted within 30 days for compliance with Rule 416.
EngineerForm: (06)
403006324
06/02/2022
1)Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations. 2)The approved Form 6, Notice of Intent will be at the location during all phases of plugging operations. 3)Operator shall implement measures to control venting and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard. 4)Properly abandon flowlines as per Rule 1105. Pursuant to Rule 911.a. Closure of Oil and Gas Facilities, Operator will submit Site Investigation and Remediation Workplans via Form 27 for COGCC prior approval before cutting and capping the plugged well, conducting flowline abandonment, and removing production equipment. Pursuant to Rule 1105.f. Abandonment Verification, within 90 days of an operator completing abandonment requirements for a flowline or crude oil transfer line, an operator must submit a Field Operations Notice, Form 42-Abandonment of Flowlines for on-location flowlines, and a Flowline Report, Form 44, for off-location flowlines or crude oil transfer lines. 5)Perform bradenhead test prior to MIRU if test has not been performed within six months of plugging. Submit results on Form 17. Contact area environmental protection specialist for sampling and analysis requirements if initial bradenhead pressure is greater than 25 psi. 6)This well has federal minerals. Operator shall notify COGCC engineering staff of any plugging changes required by the BLM or unexpected conditions in the field as soon as feasible. Primary contact is Aaron Katz at 970-765-6300. Alternate COGCC contact is Craig Burger at 970-319-4194.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
General HousekeepingForm: (02 )
400728641
1/15/2015
Prohibit Encana employees and contractors from carrying projectile weapons on Encana property, except during company organized events.
General HousekeepingForm: (02 )
400728641
1/15/2015
Prohibit pets on Encana property.
General HousekeepingForm: (02 )
400728641
1/15/2015
Strategically apply fugitive dust control measures, including enforce established speed limits on Encana private roads, to reduce fugitive dust and coating of vegetation and deposition in water sources.
WildlifeForm: (02 )
400728641
1/15/2015
Perform biological surveys (on-site) for each new development, using the most recent data sets for wildlife and wetland resources.
WildlifeForm: (02 )
400728641
1/15/2015
Perform pre-disturbance surveys when the on-site inspection and commencement of disturbance occur in different field seasons using the most recent data sets for wildlife and wetland resources.
WildlifeForm: (02 )
400728641
1/15/2015
Utilize the Encana Wildlife Resources Matrix to identify and document (where appropriate) potential impacts or concerns during the project planning phase for proposed drilling operations and construction of roads, pads and pipelines.
WildlifeForm: (02 )
400728641
1/15/2015
Minimize the number, length and footprint of oil & gas development roads
WildlifeForm: (02 )
400728641
1/15/2015
Use existing access routes where possible
WildlifeForm: (02 )
400728641
1/15/2015
Combine utility infrastructure planning (gas, electric & water) when possible with roadway planning to avoid separate utility corridors
WildlifeForm: (02 )
400728641
1/15/2015
Reduce visits to well-sites through remote monitoring when practical (i.e. SCADA). Maximize use of state-of-the-art drilling technology (e.g., high efficiency rigs, coiled-tubing unit rigs, closed-loop or pitless drilling, etc.) to minimize disturbance.
ConstructionForm: (02 )
400728641
1/15/2015
Use solar panels as an alternative energy source for on-location production equipment, where appropriate, economically and technically feasible.
ConstructionForm: (02 )
400728641
1/15/2015
Use multiple gathering lines placed in a single trench to minimize disturbance and construction, where appropriate, economically and technically feasible.
ConstructionForm: (02 )
400728641
1/15/2015
Install pipeline crossings at right angles to the drainages, wetlands, and perennial water bodies, where appropriate, economically and technically feasible.
ConstructionForm: (02 )
400728641
1/15/2015
Maintain a minimum of five feet of soil cover between the pipeline and the lowest point of the drainage or water body channel.