| Engineer | Form: (04) 400507970 11/29/2013 | Operator has COGCC concurrence to vent the bradenhead. This is preferably done via a hard line to a tank. Berry can vent for 90 days. After the venting period, shut the well in for a 24-hour period (or longer, up to 48 hours). Notify COGCC what the bradenhead-pressure (BHP) and shut-in duration are. We may have to discuss remediation if the BHP has not sufficiently dissipated. |
| Engineer | Form: (04) 400617070 07/02/2014 | opr attached the two gas analyses requested on a May 2010 Sundry, request to vent, in which K King (COGCC) requested samples (analyzed) of the bradenhead and of the tubing. the two samples are of different sources.
Remediation should be done. |