Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-045-11373HOOKER
30-01C
TEP ROCKY MOUNTAIN LLC
96850
PR
12/1/2023
RULISON
75400
GARFIELD  045
NWNE 30 6S93W 6
335165View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
403364015
04/12/2023
1) Complete repair work or P&A well by 9/7/2023 (6 months from the date of identifying the integrity issue)
EngineerForm: (04)
403384844
05/09/2023
1) Report work completed with a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes or there is not an updated WBD in the well file submit an updated WBD. 2) Complete a bradenhead test following completion of the repair and submit results on a Form 17 or directive approved method 3) For applicable operations, submit a Form 5A or 5 within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run
OGLAForm: (04)
403384844
05/09/2023
Operator will control all emissions and fluids during casing repair operations.
 
COGIS - Best Management Practice Results
No records to display.