Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-045-11360HOOKER
30-02A
TEP ROCKY MOUNTAIN LLC
96850
PR
12/1/2023
RULISON
75400
GARFIELD  045
NWNE 30 6S93W 6
335165View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
402252865
02/19/2020
1) Venting to maintain the bradenhead pressure below 0.25 times the surface casing setting depth (TVD) in psi is approved. Perform annual Bradenhead tests reported on a Form 17 and an annual update sundry with the duration of venting or number of times the annulus was vented. 2) COGCC staff encourages the use of a combustor for vented bradenhead gas when feasible without the use of supplemental fuel for the combustor. An enclosed flare shall be used, unless an open flare is specifically allowed by Colorado Department of Public Health and Environment (CDPHE) Regulation 7. 3) Comply with any CDPHE, Air Pollution Control Division rules or requirements for all atmospheric discharges. 4) Any liquids blown down are to be collected, stored, handled, and treated or disposed as E&P waste per COGCC’s 900 series rules.
EngineerForm: (04)
402877101
01/11/2022
1. Bradenhead gas is not to be vented to atmosphere; any gas from the Bradenhead will be routed to an enclosed tank and/or combustor. 2. At the conclusion of the twelve months, submit a BHP Sundry that summarizes current well conditions and includes the annual BH test Form 17.
 
COGIS - Best Management Practice Results
No records to display.