| Engineer | Form: (04) 404117758 03/11/2025 | 1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. Well to be plugged or repaired within 6 months of identifying integrity issue (8/13/2025). Pressure is to be managed and mitigated until plugging or repair is complete.
3. Shut in bradenhead pressure shall not exceed threshold pressure.
|
| Engineer | Form: (04) 404467840 01/20/2026 | Operator shall continue to monitor pressure and report to ECMC through annual testing. If monitored well conditions meet action threshold or indicate a deficiency, a new bradenhead test and sundry must be filed. |