| Engineer | Form: (04) 400507969 12/02/2013 | Vent off high bradenhead-pressure (BHP) through a hard-line to a tank for 90 days. Record BHP at conclusion of venting period. Shut well in for 48 hours. Record built-up BHP and furnish results to COGCC.
Additional venting and/or remediation may be required. |