WELL05-045-10906NORTH BANK
C4
TEP ROCKY MOUNTAIN LLC
96850
PR
10/15/2007
MAMM CREEK
52500
GARFIELD  045
NESW 12 6S93W 6
336013View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
401138152
01/18/2017
1) Operator shall comply with the Notice to Operators Drilling Wells in the Buzzard, Mamm Creek, and Rulison fields, Garfield County and Mesa County – Procedures and Submittal Requirements for Compliance with COGCC Order Nos. 1-107, 139-56, 191-22, and 369-2 (“Bradenhead NTO”), dated July 8, 2010. 2) At least once a year perform a bradenhead test and report results on operator’s annual spreadsheet or on a Form 17, as specified in the Bradenhead NTO. 3) COGCC staff encourages the use of a combustor for vented bradenhead gas when feasible without the use of supplemental fuel for the combustor. An enclosed flare shall be used, unless an open flare is specifically allowed by Colorado Department of Public Health and Environment (CDPHE) Regulation 7. 4) Comply with any CDPHE, Air Pollution Control Division rules or requirements for all atmospheric discharges. 5) Any liquids blown down are to be collected, stored, handled, and treated or disposed as E&P waste per COGCC’s 900 series rules. 6) Annular spaces shall not be tied to sales without COGCC engineering approval on a Sundry Notice, Form 4, describing equipment configuration, proper pressure regulation and check valves. At least one check valve is required for annular spaces that are tied to sales. Maintain equipment for pressure regulation and check valves in good working order.
EngineerForm: (04)
401420831
10/31/2017
1)Operator shall comply with the Notice to Operators Drilling Wells in the Buzzard, Mamm Creek, and Rulison fields, Garfield County and Mesa County – Procedures and Submittal Requirements for Compliance with COGCC Order Nos. 1-107, 139-56, 191-22, and 369-2 (“Bradenhead NTO”), dated July 8, 2010. 2)At least once a year shut in bradenhead for 7 days and perform a bradenhead test if pressure builds to 150 psi. Report results on operator’s annual spreadsheet and on a Form 17 if bradenhead test was performed, as specified in the Bradenhead NTO. 3)Comply with any CDPHE, Air Pollution Control Division rules or requirements for all atmospheric discharges. 4)Any liquids blown down are to be collected, stored, handled, and treated or disposed as E&P waste per COGCC’s 900 series rules. 5)At least one check valve is required for annular spaces that are tied to sales. Maintain equipment for pressure regulation and check valves in good working order.
EngineerForm: (04)
404518441
02/11/2026
Operator shall continue to monitor pressure and report to ECMC through annual testing. If monitored well conditions meet action threshold or indicate a deficiency, a new bradenhead test and sundry must be filed.
 
COGIS - Best Management Practice Results