| Engineer | Form: (06) 401689588 07/19/2018 | 1)Provide 48 hour notice of plugging MIRU via electronic Form 42.
2)Properly abandon flowlines as per Rule 1105. File electronic Form 42 once abandonment complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator shall submit a Flowline Report, Form 44.
|