| Engineer | Form: (04) 402766831 10/21/2021 | 1) Report work completed with a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results
2) If wellbore geometry changes or cement work is executed, submit information on a Form 5
|
| Engineer | Form: (04) 402928858 01/25/2022 | 1. Bradenhead gas is not to be vented to atmosphere; any gas from the Bradenhead will be routed to an enclosed tank and/or combustor.
2. At the conclusion of the twelve months, submit a BHP Sundry that summarizes current well conditions and includes the annual BH test Form 17.
3. Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report
4. At least once a year shut in bradenhead for 7 days or until the pressure reaches the bradenhead threshold and perform a bradenhead test. Report results on a Form 17, as specified in Rule 420 or other Director approved submittal method.
5. Comply with any CDPHE, Air Pollution Control Division rules or requirements for all atmospheric discharges.
6. Any liquids blown down are to be collected, stored, handled, and treated or disposed as E&P waste per COGCC’s 900 series rules.
7. At least one valve is required to monitor pressure and sample flow from the bradenhead.
|