Engineer | Form: (06 ) 400518149 1/7/2014 | changed P&A procedure step of balanced in-casing plug from 2900' to 2000' w/100 sx to perf-&-squeeze 50' below surface shoe (2125') step. CICR @ 2025' +/- would be good idea. This substitution can be bypassed if circulation is not possible from perfs outside surface casing to surface through annulus -- in which case OPR reverts back to originally-proposed step. |
Reclamation Specialist | Form: (04 ) 403237273 11/29/2022 | Remediation project #9257 remains active on the Location; closure and reclamation of the remediation project will be required prior to final passing of the Location itself. |