COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
404488188
01/21/2026
1) For applicable operations, report work completed within 30 days on a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes or there is not an updated WBD in the well file submit an updated WBD. 2) For applicable operations, submit a Form 5 or 5A (updated packer and tubing depths) within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run. 3) Complete a bradenhead test within 30 days of completing the repair and submit results on a Form 17 4) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations 5) Operator shall notify ECMC Engineering staff of changes and/or additional repair methods to the approved repair procedure. 6) Complete a pressure test to verify repairs. Submit documentation of pressure test on the applicable post work ECMC form. 7) Well to be repaired within 6 months of identifying the integrity issue (9/9/2025). Pressure is to be managed and mitigated until repair is complete.
EngineerForm: (04)
404488188
01/21/2026
Prior to placing cement, run a CBL and notify ECMC Engineering staff to discuss plugging plans
EngineerForm: (04)
404416579
01/21/2026
1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare. 2. Well to be plugged or repaired within 6 months of identifying integrity issue (9/9/2025). Pressure is to be managed and mitigated until plugging or repair is complete. 3. Shut in bradenhead pressure shall not exceed threshold pressure. 4. Complete a bradenhead test within 30 days of completing the repair and submit results on a Form 17
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
WildlifeForm: (04 )
404488188
1/21/2026
Elk/Mule Deer: Wildlife – Minimization: TEP will make best efforts to minimize operations at these location during winter months by conducting operations, when possible, between 9:00am to 4:00pm when wildlife activity minimal.
WildlifeForm: (04 )
404488188
1/21/2026
Elk/Mule Deer: Wildlife – Minimization: To minimize the potential for wildlife related traffic accidents, TEP has implemented speed restrictions for all lease roads and requires that all TEP employees and contractors adhere to these posted speed restrictions.
WildlifeForm: (04 )
404488188
1/21/2026
Elk/Mule Deer: Wildlife –Minimization: TEP will minimize vehicle numbers and traffic by carpooling to the site whenever possible
Storm Water/Erosion ControlForm: (04 )
404488188
1/21/2026
Due to proximity to a wetland and surface water, operator will use secondary containment for all tanks and other liquid containers. Operator will implement stormwater BMPs and erosion control measures as needed to prevent sediment and stormwater runoff from entering the wetland and surface water