Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-045-06648BARRETT ET AL
GV 21-35
TEP ROCKY MOUNTAIN LLC
96850
PR
11/1/2021
GRAND VALLEY
31290
GARFIELD  045
SESE 35 6S96W 6
334743View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
400793277
02/18/2015
1) Provide cement bond log with sundry reporting work done.
EngineerForm: (06)
400850263
06/15/2015
1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) Properly abandon flowlines per Rule 1103. File electronic Form 42 when flowline abandonment is complete. 3) Contact COGCC engineer Craig Burger if casing pressure test fails (step 3 of procedure) to discuss changes to plugging plan. 4) Revise procedure to provide annular cement to 200’ above the Mesaverde top and a casing stabilization plug (required at 3000’ intervals). Perforate at 3500’ and squeeze with a minimum of 30 sxs. Place at least 100’ of cement in the annulus and leave at least 100' in casing. Tag plug if not placed below a CICR. Add casing plug across DV tool at 2240', from 2290' to 2190' with minimum 10 sacks.
 
COGIS - Best Management Practice Results
No records to display.