| Engineer | Form: (04) 403445096 10/24/2023 | 1) If the bradenhead pressure exceeds the adjusted threshold pressure, submit a new Form 4 Sundry -Bradenhead Plan
2) Monitor fluid level in bradenhead annulus and report fluid level increase changes to the ECMC
3) Submit an updated WBD
4) Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. Copies of all final laboratory analytical results shall be provided to the ECMC within three (3) months of collecting the samples. |