Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-045-06028WEST SALT CREEK-FEDERAL
2-18 (OWP)
LOCIN OIL CORPORATION
51130
PR
12/1/2023
SOUTH CANYON
77750
GARFIELD  045
NENW 18 7S103W 6
322321View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
403053885
08/16/2022
1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report 2) At least once a year shut in bradenhead for 7 days or until the pressure reaches the bradenhead threshold and perform a bradenhead test. Report results on a Form 17, as specified in Rule 420 or other Director approved submittal method. 3) Complete subsequent Form 21 MITs in accordance with the timelines set forth in Rule 417 once the gas plant is back operational. If well is not returned to production following gas plant repairs, an MIT is due by 05-31-2027
 
COGIS - Best Management Practice Results
No records to display.