WELL05-017-07799NORTHWEST ARAPAHOE UNIT (NWAU)
38
MULL DRILLING COMPANY INC
61250
PR
9/1/2021
ARAPAHOE
2875
CHEYENNE  017
NWSW 25 13S43W 6
439262View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
400682928
9/24/2014
1) Provide 48 hour notice prior to spud via electronic Form 42. 2) If production casing is set provide cement coverage from TD to at least 200’ above MRRW. Cement across Cheyenne/Dakota aquifers (2400’ – 1700’). Verify with CBL. 3) If well is a dry hole set the following plugs: 40 sks cement +/- 50’ above the MRRW, 40 sks cement +/- 50’ above any DST w/ show, 40 sks cement at 2400’ up, 40 sks cement at 1700’ up, 50 sks cement from 50’ below surface casing shoe up into surface casing, 10 sks cement in top of surface csg, cut 4 ft below GL, weld on plate, 5 sks cement each in rat hole and mouse hole.
PermitForm: (02 )
400682928
10/9/2014
Open hole resistivity and gamma logs shall be run to describe the stratigraphy of the entire well bore and to adequately verify the setting depth of surface casing and aquifer coverage. On a multi-well pad, these open hole logs are only required on one of the first wells drilled on the pad and the Drilling Completion Report - Form 5 for every well on the pad shall identify which well was logged.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02 )
400682928
10/9/2014
• Conduct Initial Site Assessment o Identification of nearby water bodies o Identification of vegetation types o Identification of protected wildlife species o Identification of potential access routes to minimize disturbances o Identification of nearby improvements
Pre-ConstructionForm: (02 )
400682928
10/9/2014
• Preparation of a Storm Water Pollution Prevention Plan. Acquisition of a Storm Water Discharge Permit • Consultation with the surface landowner or appointed agent • Finalize access routes • Finalize well pad location to minimize surface grade impacts • Finalize well pad layout to minimize disturbances • Develop wildlife management plan if protected species are present
General HousekeepingForm: (02 )
400682928
10/9/2014
• Drilling and production operations conducted in safe, workmanlike manner. Safety expectations include good housekeeping. • During drilling/completion operations, debris stored in caged container which is removed from the site. • During production operations, the lease is inspected daily by MDC personnel.
WildlifeForm: (02 )
400682928
10/9/2014
• Development and implementation of a Wildlife Management Plan if protected species are present
Storm Water/Erosion ControlForm: (02 )
400682928
10/9/2014
• During drilling / completion operations, implementation of Storm Water Pollution Prevention Plan • Following drilling/completion operations, prompt reclamation of disturbed areas • During production operations, implementation of MDC’s Post Construction Storm Water Management Program
Material Handling and Spill PreventionForm: (02 )
400682928
10/9/2014
• During drilling/completion operations, storage areas graded towards pit • During production operations, implementation of Spill Prevention, Control and Countermeasure Plan & daily inspection • All stock and produced water tanks have secondary containment
ConstructionForm: (02 )
400682928
10/9/2014
• Access road, well pad and pit disturbances minimized • Soils segregated by type to facilitate reclamation • Storm water controls deployed and routinely inspected
Drilling/Completion OperationsForm: (02 )
400682928
10/9/2014
Includes Structural Practices • Implement Storm Water Pollution Prevention Plan, including routine inspections and evaluation of effectiveness • Locate tank batteries at safe distance from public roadways and railhead • Full containment for stock tanks and separators • Installation of pipelines in common trenches when practical • Installation of pipelines at right angles to water bodies (drainages, wetlands, perennial water bodies) where practical Site Specific: 1. Reporting of the presence of H2S will be done via verbal and email notices. Verbal notice with a follow up email will be provided as soon as practicable upon detection of H2S to COGCC’s area engineer and the local government designee. 2. Per ephemeral stream 29 feet southeast of staked location – structural practices will be implemented at the site to minimize erosion and sediment transport. Practices may include but are not limited to: straw bales, wattles/sediment control logs, silt fences, earth dikes, drainage swales, sediment traps, subsurface drains, pipe slope drains, inlet protection, outlet protection, gabions, and temporary sediment basins.
Interim ReclamationForm: (02 )
400682928
10/9/2014
• Debris and waste material removed • Areas not in use reclaimed promptly; pits closed using segregated material; well pad and other compacted surfaces ripped • Noxious weeds controlled
Final ReclamationForm: (02 )
400682928
10/9/2014
• All equipment and debris removed • All remaining disturbed areas, including access roads, reclaimed • Noxious Weed Control Plan developed if appropriate