| Engineer | Form: (02) 400345395 12/03/2012 | 1) Provide 48 hour notice of spud via electronic Form 42.
2) Cement production casing from TD to at least 200’ above shallowest completed interval or 200’ above Shawnee whichever is shallower. Stage cement from 2450’-1750’ (Cheyenne-Dakota) and 450’ to 50’ above surface casing. Run CBL to verify.
3) If well is a dry hole set the following plugs: 40 sks cement 50’ above MSSP, 40 sks cement 50’ above SHWNE 40 sks cement above any DST w/ show, 40 sks cement 50’ below base of Cheyenne (2450’ up), 40 sks cement 50’ above top of Dakota (1750’ up), 40 sks cement at 450’, 40 sks cement from 50’ below surface casing shoe up into surface casing, 10 sks cement in top of surface csg, cut 4 ft below GL, weld on plate, 5 sks cement in rat hole and mouse hole.
|