COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06 )
403613456
12/7/2023
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations. These are two separate notifications, required by Rules 405.e and 405.l. 2) Prior to placing cement above the base of the Upper Pierre (1990') : verify that all fluid (liquid and gas) migration has been eliminated. If evidence of fluid migration or pressure remains, contact ECMC Engineer for an update to plugging orders. 3) Pump surface casing shoe plug at 1200' only after isolation has been verified. If surface casing cement is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at 754' or shallower and provide a minimum of 10 sx plug at the surface. 4) Leave at least 100’ of cement in the wellbore for each plug without mechanical isolation. 5) After cut and prior to cap, verify isolation by either a 15 minute bubble test or 15 minute optical gas imaging recording. If there is indication of flow contact ECMC Engineering. Provide a statement on the 6SRA which method was used and what was observed. Retain records of final isolation test for 5 years. 6) With the Form 6 SRA operator must provide written documentation which positively affirms each COA listed above has been addressed.
EngineerForm: (06 )
403613456
12/7/2023
Consistent with Rule 911.a, a Form 27 must be approved prior to cut and cap, conducting flowline abandonment, or removing production equipment. Allow 30 days for Director review of the Form 27; include the Form 27 document number on the Form 44 for offsite flowline abandonment (if applicable) and on the Form 6 Subsequent. Properly abandon flowlines per Rule 1105. If flowlines will be abandoned in place, include with the Form 27: pressure test results conducted in the prior 12 months as well as identification of any document numbers for a ECMC Spill/Release Report, Form 19, associated with the abandoned line.
EngineerForm: (06 )
403613456
12/7/2023
Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations. 1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the ECMC within three (3) months of collecting the samples. If there is a need for sampling, contact ECMC engineering for verification of plugging procedure.
OGLAForm: (06 )
403613456
12/11/2023
Due to close proximity to Residential Building Units (RBUs), prior to commencing operations, at a minimum, the operator will provide an informational sheet to the owners/occupants of the RBUs nearby and adjacent to the parcel with the well. The sheet will include the operator's contact information and the nature, timing, and expected duration of the P&A operations.
OGLAForm: (06 )
403613456
12/11/2023
Operator will implement measures to capture, combust, or control emissions to protect health and safety, and to ensure that vapors, odors and noise from plugging operations do not constitute a nuisance or hazard to public health, welfare and the environment.
OGLAForm: (06 )
403613456
12/11/2023
Due to the proximity to a mapped wetland, operator will use secondary containment for all tanks and other liquid containers. Operator will implement stormwater BMPs and erosion control measures to prevent sediment and stormwater runoff from entering the wetlands.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Community Outreach and NotificationForm: (04 )
403364839
4/19/2023
Blue Chip has sent out the following notifications: RBU Notifications – Sent 04/04/2023 LGD (Broomfield) Notification – Send 03/14/2023 Broomfield will be notified of the updated MIRU schedule as soon as these sundries are approved and dates are finalized.
PlanningForm: (04 )
403364839
4/19/2023
LIGHTS: Operator will conduct operations during daylight hours only
Dust controlForm: (04 )
403364839
4/19/2023
Dust suppression will be monitored and treated as necessary and will only consist of only freshwater unless otherwise requested and approved as applicable. Operator will limit speed to minimize fugitive dust emissions from vehical trafic traveling on the access road.
Noise mitigationForm: (04 )
403364839
4/19/2023
Operator will comply with maximum permissable noise levels pursuant to Rule 423 and will install temporary sound walls, straw bales, or other BMPs to aid in sound attenuation if neccessary
Odor mitigationForm: (04 )
403364839
4/19/2023
Nuisance odors are not anticipated for the Operation, however, will be monitored and treated, as necessary. Daily operations summaries will document to ensure all BMPs and COAs are met
Community Outreach and NotificationForm: (04 )
403419675
6/28/2023
When in close proximity to Residential Building Units (RBUs) and prior to commencing operations, at a minimum, the Operator will provide an informational sheet to the owners/occupants of RBUs that are nearby and adjacent to the parcel on which the well is located. The sheet will include the Operator's contact information and the nature, timing, and expected duration of the operations.
General HousekeepingForm: (04 )
403419675
6/28/2023
Lights: Operator will conduct operations during daylight hours only.
Dust controlForm: (04 )
403419675
6/28/2023
Dust suppression: Dust suppression will be monitored and treated as necessary and will only consist of only freshwater unless otherwise requested and approved as applicable. Operator will limit speed to minimize fugitive dust emissions from vehicle traffic traveling on the access road.
Noise mitigationForm: (04 )
403419675
6/28/2023
Noise: Operator will comply with maximum permissible noise levels pursuant to Rule 423 and will install temporary sound walls, straw bales, or other BMPs to aid in sound attenuation if necessary.
Odor mitigationForm: (04 )
403419675
6/28/2023
Odor: Nuisance odors are not anticipated for this Operation, however, will be monitored and treated, as necessary. Daily Operation summaries will document to ensure all BMP’s and COA’s are met