Community Outreach and Notification | Form: (04 ) 403364839 4/19/2023 | Blue Chip has sent out the following notifications:
RBU Notifications – Sent 04/04/2023
LGD (Broomfield) Notification – Send 03/14/2023
Broomfield will be notified of the updated MIRU schedule as soon as these sundries are approved and dates are finalized. |
Planning | Form: (04 ) 403364839 4/19/2023 | LIGHTS: Operator will conduct operations during daylight hours only |
Dust control | Form: (04 ) 403364839 4/19/2023 | Dust suppression will be monitored and treated as necessary and will only consist of only freshwater unless otherwise requested and approved as applicable. Operator will limit speed to minimize fugitive dust emissions from vehical trafic traveling on the access road. |
Noise mitigation | Form: (04 ) 403364839 4/19/2023 | Operator will comply with maximum permissable noise levels pursuant to Rule 423 and will install temporary sound walls, straw bales, or other BMPs to aid in sound attenuation if neccessary |
Odor mitigation | Form: (04 ) 403364839 4/19/2023 | Nuisance odors are not anticipated for the Operation, however, will be monitored and treated, as necessary. Daily operations summaries will document to ensure all BMPs and COAs are met |
Community Outreach and Notification | Form: (04 ) 403419675 6/28/2023 | When in close proximity to Residential Building Units (RBUs) and prior to commencing operations, at a minimum, the Operator will provide an informational sheet to the owners/occupants of RBUs that are nearby and adjacent to the parcel on which the well is located. The sheet will include the Operator's contact information and the nature, timing, and expected duration of the operations. |
General Housekeeping | Form: (04 ) 403419675 6/28/2023 | Lights: Operator will conduct operations during daylight hours only. |
Dust control | Form: (04 ) 403419675 6/28/2023 | Dust suppression: Dust suppression will be monitored and treated as necessary and will only consist of only freshwater unless otherwise requested and approved as applicable. Operator will limit speed to minimize fugitive dust emissions from vehicle traffic traveling on the access road. |
Noise mitigation | Form: (04 ) 403419675 6/28/2023 | Noise: Operator will comply with maximum permissible noise levels pursuant to Rule 423 and will install temporary sound walls, straw bales, or other BMPs to aid in sound attenuation if necessary. |
Odor mitigation | Form: (04 ) 403419675 6/28/2023 | Odor: Nuisance odors are not anticipated for this Operation, however, will be monitored and treated, as necessary. Daily Operation summaries will document to ensure all BMP’s and COA’s are met |