Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-013-06411ARAPAHOE MC
36-6
EXTRACTION OIL & GAS INC
10459
PA
2/21/2018
WATTENBERG
90750
BOULDER  013
SENW 36 1N69W 6
321420View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
401887290
01/03/2019
Samples of both production gas and Bradenhead gas should be taken prior to plugging. Samples should be analyzed per Bradenhead Testing and Reporting Instructions on the COGCC website.
EngineerForm: (06)
401887290
01/03/2019
Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
EngineerForm: (06)
401887290
01/03/2019
NOTE: The plug at 3100’ needs to be placed and have an 8 hour WOC to assure that all fluid migration has been stopped. If flow is not isolated after WOC, additional attempts in front of the surface shoe plug will be required. Contact COGCC for requirements. 1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) If 1084' plug not circulated to surface then tag plug – must be 150’ or shallower and provide 10 sx plug at the surface. 3) Properly abandon flowlines as per Rule 1105. File electronic Form 42 once abandonment complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator must submit a Flowline Report, Form 44.
 
COGIS - Best Management Practice Results
No records to display.