| Engineer | Form: (02) 400192087 08/17/2011 | 1) Provide 24 hour notice of MIRU to Jim Precup at 303-469-1902 or e-mail at james.precup@state.co.us .
2) Note increased surface casing depth: Set at least 1950’ of surface casing. Cement to surface.
3) Provide cement coverage from base of intermediate casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
4) Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
| Engineer | Form: (04) 400562131 03/02/2014 | 1) The flaring of natural gas shall be allowed in accordance with COGCC Rule 912 for the initial production test period. 2) Notify the local emergency dispatch or the local governmental designee of any natural gas flaring.
3) Submit updated requests to flare to COGCC on Form 4 (Sundry Notice), which discuss whether or not any new gathering systems or increased development of the field have changed pipeline economics such that installation of a new pipeline would be an economically viable option in lieu of continued flaring.
4) The operator is required to obtain and maintain any required air permits from CDPHE.
5) The flare volumes shall be reported by Form 7, Operator’s Monthly Report of Operations.
|
| Field Inspector | Form: (04) 400568151 03/12/2014 | Field inspection to be performed |