| Engineer | Form: (02) 400253500 03/15/2012 | Prior to recomplete, operator must: 1) Verify existing cement with a cement bond log. 2) If it is not present as follows, provide remedial cement 200’ above Niobrara (minimum cement top of 7580’) and 2180’ (Bradenhead) into the surface casing shoe. Verify remedial cement coverage with cement bond log. 3) Submit Contractor's Job Summary for Bradenhead cement (1973) along with Form 5 for current recompletion. |
| Permit | Form: (02) 400253500 04/02/2012 | Operator shall implement fluids handling and/or spill control BMPs to prevent any spilled or released fluids from reaching Coal Creek. |
| Engineer | Form: (04) 402570948 01/29/2021 | If well is not producing by December 21, 2022, an official MIT will need to be done. |
| Engineer | Form: (04) 403362634 04/06/2023 | If well is not producing by April 30, 2024, an official MIT will need to be done. |
| DOW | Form: (04) 403362634 04/06/2023 | Well has been designated Inactive as of 05/31/2018. Submit a Form 5B, Inactive Well Notice. |