Planning | Form: (02 ) 401129652 2/9/2017 | ConocoPhillips will use perimeter controls and they will be in place prior to site grubbing and clearing. |
Drilling/Completion Operations | Form: (02 ) 401129652 2/9/2017 | One of the first two wells drilled on the pad will be logged with open-hole Resistivity Log and Gamma Ray Log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached.The Form 5 for a well without open-hole logs shall clearly state “No open-hole logs were run” and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run. |
Drilling/Completion Operations | Form: (04 ) 401436224 3/23/2018 | One of the first wells drilled on the pad will be logged with open-hole Resistivity Log
and Gamma Ray Log from the kick-off point into the surface casing. All wells on the
pad will have a cement bond log with gamma-ray run on production casing (or on
intermediate casing if production liner is run) into the surface casing. The horizontal
portion of every well will be logged with a measured-while-drilling gamma-ray log. The
Form 5, Completion Report, for each well on the pad will list all logs run and have
those logs attached. The Form 5 for a well without open-hole logs shall clearly state
“No open-hole logs were run” and shall clearly identify (by API#, well name & number)
the well in which open-hole logs were run. |
Drilling/Completion Operations | Form: (02 ) 401587472 5/25/2018 | One of the first wells drilled on the pad will be logged with open-hole Resistivity Log and Gamma Ray Log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state “No open-hole logs were run” and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run. |