WELL05-001-09968Shook
3-10-1CDH
PROVIDENCE OPERATING LLC DBA POCO OPERATING
10694
PR
6/1/2022
WATTENBERG
90750
ADAMS  001
NWSE 3 1S67W 6
448269View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
400960718
7/18/2016
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad. 2) Comply with Rule 317.j. and provide cement coverage from TD to a minimum of 200' above Niobrara and from 200’ below Sussex to 200’ above Sussex. Verify coverage with cement bond log.
EngineerForm: (02 )
400960718
7/18/2016
1) Bradenhead test shall be performed within 60 days of rig release and prior to stimulation. Test results shall be submitted on Form 17 within 10 days of test. 2) Bradenhead test shall be performed between 6 and 7 months after rig release and shall be submitted on Form 17 within 10 days of test. 3) Bradenhead test shall be performed within 30 days of First Production as reported on Form 5A and shall be submitted on Form 17 within 10 days of test.
EngineerForm: (04 )
402886474
6/22/2022
1. Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare. 2. Bradenhead gas is not to be vented to the atmosphere; any gas from the Bradenhead will be routed to the specified abatement system. Shut in bradenhead pressure shall not exceed 50 psig. Operator shall implement measures to get an estimate of the gas flow rate and/or volume from the bradenhead. 3. Within thirty days of 10/11/2022, submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans, sample analysis interpretation, bradenhead test description, and the flow rate information and pressure data. 4. Shut well in for at least seven days to monitor build up pressures then conduct a new bradenhead test and submit the Form 17 within ten days of the test. 5. If a sample has not been collected from surface casing within the last twelve months collect bradenhead gas samples for laboratory analysis. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results shall be provided to the COGCC within three months of collecting the samples.
EngineerForm: (04 )
402886474
6/22/2022
Bradenhead test date 11/11/2021 had 574 psig on the surface casing, and had gas at surface.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02 )
400960718
9/9/2016
Multi-Well Pads (NEW): PetroShare is permitting an Oil and Gas Location Assessment - Form 2A as a multi-well pad through the Colorado Oil and Gas Conservation Commission. This will eliminate the need for multiple well pads which would ultimately require more surface disturbance.
PlanningForm: (02 )
400960718
9/9/2016
Visual Mitigation: The location was placed to utilize a natural and existing tree line that will act as a visual barrier.
Traffic controlForm: (02 )
400960718
9/9/2016
PetroShare will construct all leasehold roads to accommodate local emergency vehicle access requirements and will be maintained in a reasonable condition.
General HousekeepingForm: (02 )
400960718
9/9/2016
Removal of Surface Trash: PetroShare agrees that all trash, refuse pipe, equipment, liquids, chemicals of other materials that are not necessary for the continued operations of the wells will be removed and disposed of no later than 30 days after completion. No such items will be burned or buried on location.
General HousekeepingForm: (02 )
400960718
9/9/2016
Guy Line Anchors: All guy line anchors left buried for future use will be identified by a marker of bright color not less than four feet in height and not greater than one foot further of the guy line anchor.
WildlifeForm: (02 )
400960718
9/9/2016
The proposed oil and gas wells are not within a sensitive wildlife habitat. PetroShare, to the extent possible will not cause significant degradation of wildlife.
Storm Water/Erosion ControlForm: (02 )
400960718
9/9/2016
Site Specific Measures: PetroShare will maintain a Stormwater Management Plan with site specific measurements to assess erosion control.
Material Handling and Spill PreventionForm: (02 )
400960718
9/9/2016
Leak Detection Plan: The Leak Detection Plan has been included as an Attachment "OTHER" (Document #1010092).
Material Handling and Spill PreventionForm: (02 )
400960718
9/9/2016
Berm Construction: A steel containment berm or structure will be erected around the oil and water storage tanks. The steel berm will be inspected at least every 14 calendar days while the site is under construction and within 24 hours of a precipitation event. During production phase One to seven inspections per week will be recorded and kept in the district office and available to regulatory agencies. Records will be kept electronically indefinitely.
Material Handling and Spill PreventionForm: (02 )
400960718
9/9/2016
Tank specifications: Tanks shall be constructed and maintained in accordance with the National Fire Protection Association Code 30 (2008 version). All tanks will be visually inspected once a day. Recorded inspections will be conducted once a month pursuant to 40 CFR §112.
Dust controlForm: (02 )
400960718
9/9/2016
Fresh water, per COGCC rules, or another approved source may be applied to roads and land surfaces for purposes of dust mitigation. No other liquid or substance generated by the production of the oil and gas facility will be applied to the roads and land surfaces.
ConstructionForm: (02 )
400960718
9/9/2016
Fencing: The wellsite will be fenced for security and in concurrence with surface owner.
ConstructionForm: (02 )
400960718
9/9/2016
Visual Mitigation: Pursuant to Rule 804, the tank battery shall be painted in uniform, non-contrasting, non-reflective color tones with the colors matched to but slightly darker than the surrounding landscape.
Noise mitigationForm: (02 )
400960718
9/9/2016
Noise: An ambient sound study will be conducted to determine noise impacts to the nearby residents to the southeast. Based on the results of the noise study, the appropriate sound mitigation design will be implemented. Sound mitigation will include sound walls and will be erected to reduce noise pollution. Results of the noise study will be made available to the COGCC upon request. The location was selected due to an existing tree line that will also act as a sound barrier.
Emissions mitigationForm: (02 )
400960718
9/9/2016
Air Emissions: Air containment emission sources shall comply with the permit and control provisions of the state air quality control program and the rules and regulation promulgated by the State Air Quality Control. PetroShare will employ such control measures and operating procedures as are necessary to minimize fugitive particulate emissions into the atmosphere.
Odor mitigationForm: (02 )
400960718
9/9/2016
Odor Mitigation: PetroShare will comply with Rule 805 and Department of Public Health and Environment, Air Quality Control Commission, Regulation No. 2 Odor Emission, 5 C.C.R. 1001-4, Regulation No. 3 (5 C.C.R. 1001-5), and Regulation No. 7 Section XVII.B.1 (a-c) and Section XII.
Drilling/Completion OperationsForm: (02 )
400960718
9/9/2016
Control of Fire Hazards: PetroShare and its contractor’s will employ best management practices during the drilling and production of its wells and facilities. They will comply with appropriate COGCC and any county rules concerning fire and safety. PetroShare will ensure that any material not in use that may constitute a fire hazard will remain no less than 25 feet from the wellhead (s), tanks and separator(s).
Drilling/Completion OperationsForm: (02 )
400960718
9/9/2016
Green Completions: Emission Control Systems. Test separators and associated flow lines and sand traps shall be installed on-site to accommodate Green completion techniques pursuant to COGCC Rules. PetroShare intends to utilize pipelines to transport oil and gas, reducing the amount of onsite tanks to one. PetroShare will utilize a VOC to reduce emissions.
Drilling/Completion OperationsForm: (02 )
400960718
9/9/2016
Closed Loop Drilling Systems – Pit Restrictions: Closed Loop System will be used for drilling and fluid management. No reserve pit will be used.
Drilling/Completion OperationsForm: (02 )
400960718
9/9/2016
Rig with Kelly: The BOP will include a minimum of double ram with blind ram pipe ram, annular preventer or a rotating head. At least one (1) person with training for blowout prevention will be on location during all drilling operations.
Drilling/Completion OperationsForm: (02 )
400960718
9/9/2016
BOPE Testing for Drilling Operations: BOPE tests will be done upon initial rig-up and once every 30 days during drilling operations, pressure testing of the casing string and each component of the BOPE will be performed to 70% of working pressure or 70% of the internal yield of the casing, whichever is less.
Drilling/Completion OperationsForm: (02 )
400960718
9/9/2016
BOPE Testing for Well Servicing Operations: Adequate blowout prevention equipment will be used on any servicing operations associated with this well. Backup staving valves shall be required on well servicing operations during reverse circulation. Valves will be pressure tested before each well servicing operation using both low-pressure and high-pressure fluid.
Drilling/Completion OperationsForm: (02 )
400960718
9/9/2016
Drill Stem Test: Not applicable. No drill stem tests are planned.
Drilling/Completion OperationsForm: (02 )
400960718
9/9/2016
Lighting: All permanent lighting will be directed downward and internally. Temporary lighting shall conform to COGCC rules and regulations and not adversely affect adjacent residential properties. The nearest public road is 900’ away. Lighting from the location will not affect visibility on the road. There is a natural tree barrier between the location and the nearest public road to mitigate light pollution.
Drilling/Completion OperationsForm: (02 )
400960718
9/9/2016
Logging: One of the first wells drilled on the pad will be logged with open-hole Resistivity Log and Gamma Ray Log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state “No open-hole logs were run” and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run.