Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-001-09805Reserve 3-65 34-35
1H
CRESTONE PEAK RESOURCES OPERATING LLC
10633
PR
4/18/2025
DJ HORIZONTAL NIOBRARA
16950
AURORA/ADAMS  001
NENE 35 3S65W 6
436726View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
400541716
1/26/2014
PILOT HOLE 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. FOR LATERAL 2) Comply with Rule 317.i and provide cement coverage from end of 7” casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
EngineerForm: (02 )
400541892
1/26/2014
PILOT HOLE 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. FOR LATERAL 2) Comply with Rule 317.i and provide cement coverage from end of 7” casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
EngineerForm: (04 )
400780211
6/30/2015
1) The flaring of natural gas shall be allowed in accordance with COGCC Rule 912 for the initial production test period. The combustion device must have a design destruction efficiency of at least 98% for hydrocarbons. 2) Notify the local emergency dispatch or the local governmental designee of any natural gas flaring. 3) Submit updated requests to flare to COGCC on Form 4 (Sundry Notice), which discuss whether or not any new gathering systems or increased development of the field have changed pipeline economics such that installation of a new pipeline would be an economically viable option in lieu of continued flaring. 4) The operator is required to obtain and maintain any required air permits from CDPHE. 5) The flare volumes shall be reported by Form 7, Operator’s Monthly Report of Operations.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
400541716
4/13/2014
MEMORANDUM OF UNDERSTANDING This Memorandum of Understanding (“MOU”) is made and entered into this _____ day of ______, 2013, by and between Arapahoe County, a Colorado County (“County”) with an address of 5334 S. Prince St., Littleton, Colorado 80120 and (“Operator”), with an address of . The Operator and the County may be referred to individually as a “Party” or collectively as the “Parties.” BACKGROUND A. Operator is the owner or lessee of oil and gas leasehold and/or mineral interests within unincorporated parts of the County, and, as of the time of the execution of this MOU, has the right and intent to further develop its oil and gas leasehold and/or mineral interests within said portion of the County. B. The intent of this MOU is to provide the conditions under which Operator will develop and operate future oil and gas facilities or newly expanded facilities in the unincorporated portions of the County, in order to foster the efficient and economic production of oil and gas resources, to protect human health, safety and welfare and to protect the environment and wildlife resources, while at the same time providing for a predictable and expeditious administrative process for obtaining County land use approvals and permits for oil and gas facilities. The terms “facility” or “facilities” are defined here as including oil and gas wellsites, flowlines, tank batteries, compressor stations, pits/ponds, below-grade tanks, dehydration units, vapor recovery units (VRUs), and associated roads. Pipelines and gathering systems, other than flowlines, as well as salt water disposal wells and injection wells are excluded. Locations with more than one of the above mentioned types of equipment will also be considered to be one facility. Unless indicated otherwise, the definitions of terms used in the MOU shall be the same as in the Colorado Oil and Gas Conservation Commission’s ("Commission") Rules. NOW, THEREFORE, the Parties agree as follows: 1. Intent to Supplement Commission Rules and Regulations. The Parties recognize that pursuant to the Colorado Oil and Gas Conservation Act, C.R.S. §§ 34-60-101, et seq. ( “Act”), the Commission regulates the development and production of oil and gas resources in Colorado, and the Act authorizes the Commission to adopt statewide rules and regulations. The provisions of this MOU are intended to supplement and add to the Commission’s rules and regulations. To the extent that any of the provisions of this MOU are in conflict with the Act or COGCC rules and regulations, the stricter standards shall govern. 2. Operator’s Pit Practices within the County. The Operator will comply, at a minimum, with the following pit practices, after the date of this MOU: a. Preferred Option: It is the intent of the County that operators utilize closed-loop or modified closed-loop systems for drilling and completion operations in order to minimize or eliminate the need for earthen pits; however, notwithstanding the foregoing, where appropriate, and subject to prior County approval, the County generally supports: 1) the use of unlined drilling pits when bentonite or a similar clay additive is used during the drilling process, and 2) the use of lined single- or multi-well water storage pits in order to minimize the transport of water and promote recycling, subject to the requirements set forth in this subsection. Permitted modified closed-loop systems include oil and gas wells where air or fresh water is used to drill through the surface casing interval, defined as fifty (50) feet below the depth of the deepest aquifer, and a closed loop system is used for the remainder of the drilling and/or completion or recompletion procedures. Multi-well pits are defined as lined, engineered pits, constructed over an engineered base, with construction or liner specifications meeting or exceeding Commission pit lining rules, that will serve the functions of drilling, completion, and/or flowback pits for more than one well. b. Water Storage Pits to Contain Fresh Water or Brine Water: Water stored in pits approved by the County and allowed under Commission Rules, must meet the definition of fresh water or brine water, except for water stored in pits listed in 2c below. Fresh water is defined as containing total dissolved solids (TDS) less than or equal to 5,000 milligrams/liter (mg/l). Brine water is defined as water produced from an oil and/or gas well with TDS of greater than 5,000 mg/l. The Operator is required to remove all free and visible oil within 24 hours of discovery. Upon closure of the pit, the Operator will ensure the protection of the public health and environment by following all Commission pit closure rules, including collecting analytical data to ensure compliance with state standards. As long as the pit is open and containing fluid, a representative water sample shall be taken every six months from the surface of the pit fluids, the first sample to be taken within 6 months of the pit becoming operational. Water quality data will also include an analysis of Sodium Adsorption Ratio (SAR). The County will review water quality data provided by the Operator every six (6) months. TDS, pH, and specific conductance can be measured with a field meter. TEPH (total extractable petroleum hydrocarbons), BTEX (Benzene, Toluene, Ethylbenzene, and Xylenes), and SAR will be analyzed by an accredited laboratory. If the presence of TEPH and/or BTEX is indicated after County review and/or inspection, other water quality analyses may be required by the County. c. Additional Pits that Require County Review and Approval: Skimming, settling, percolation, evaporation, and any type of netted pits are generally discouraged by the County; however such pits may be approved on a case-by-case basis through the Use by Special Review ("USR") process. A copy of the Pit Plan submitted to the Commission will be provided to the County at the same time as the plans are submitted to the Commission. Construction of these pits will be preceded by collection of “baseline” soil samples from the center of the planned pit at 6 and 18 inches depth. Soil samples will be analyzed for pH, Sodium Adsorption Ratio (SAR), and Electrical Conductivity (EC). The Operator shall stake and photograph from the center of the planned pit (toward north, south, east, and west directions) for inclusion in the County’s copy of the Pit Plan. Upon closure of these pits, pH, SAR, EC, BTEX (Benzene, Toluene, Ethylbenzene, and Xylenes), and TEPH (total extractable petroleum hydrocarbons) analyses may be required if there is evidence of leaks or spills in the immediate area of the pits. d. Pits That Do Not Require County Approval: Flare, Emergency, Plugging, and Workover pits will not require county review or approval prior to construction (unless within 1/4 mile of a residence as set forth below); however, the County will be copied on the notification(s) sent to the Commission and any pit plans, remediation plans, or analytical results submitted to the Commission. e. Pit Setbacks: All pit construction within ¼ mile of a residence or water well is generally discouraged by the County and may have additional County requirements, such as fencing. Such pits will be reviewed on a case-by-case basis by the County. f. Multi-Well Pits: In additi
Drilling/Completion OperationsForm: (02 )
400541716
4/13/2014
Open hole resistivity log with gamma ray will be run on the vertical portion of this well to describe the stratigraphy of the vertical section of the wellbore and to adequately verify the setting depth of the surface casing and aquifer coverage.
Drilling/Completion OperationsForm: (02 )
400541892
4/13/2014
MEMORANDUM OF UNDERSTANDING This Memorandum of Understanding (“MOU”) is made and entered into this _____ day of ______, 2013, by and between Arapahoe County, a Colorado County (“County”) with an address of 5334 S. Prince St., Littleton, Colorado 80120 and (“Operator”), with an address of . The Operator and the County may be referred to individually as a “Party” or collectively as the “Parties.” BACKGROUND A. Operator is the owner or lessee of oil and gas leasehold and/or mineral interests within unincorporated parts of the County, and, as of the time of the execution of this MOU, has the right and intent to further develop its oil and gas leasehold and/or mineral interests within said portion of the County. B. The intent of this MOU is to provide the conditions under which Operator will develop and operate future oil and gas facilities or newly expanded facilities in the unincorporated portions of the County, in order to foster the efficient and economic production of oil and gas resources, to protect human health, safety and welfare and to protect the environment and wildlife resources, while at the same time providing for a predictable and expeditious administrative process for obtaining County land use approvals and permits for oil and gas facilities. The terms “facility” or “facilities” are defined here as including oil and gas wellsites, flowlines, tank batteries, compressor stations, pits/ponds, below-grade tanks, dehydration units, vapor recovery units (VRUs), and associated roads. Pipelines and gathering systems, other than flowlines, as well as salt water disposal wells and injection wells are excluded. Locations with more than one of the above mentioned types of equipment will also be considered to be one facility. Unless indicated otherwise, the definitions of terms used in the MOU shall be the same as in the Colorado Oil and Gas Conservation Commission’s ("Commission") Rules. NOW, THEREFORE, the Parties agree as follows: 1. Intent to Supplement Commission Rules and Regulations. The Parties recognize that pursuant to the Colorado Oil and Gas Conservation Act, C.R.S. §§ 34-60-101, et seq. ( “Act”), the Commission regulates the development and production of oil and gas resources in Colorado, and the Act authorizes the Commission to adopt statewide rules and regulations. The provisions of this MOU are intended to supplement and add to the Commission’s rules and regulations. To the extent that any of the provisions of this MOU are in conflict with the Act or COGCC rules and regulations, the stricter standards shall govern. 2. Operator’s Pit Practices within the County. The Operator will comply, at a minimum, with the following pit practices, after the date of this MOU: a. Preferred Option: It is the intent of the County that operators utilize closed-loop or modified closed-loop systems for drilling and completion operations in order to minimize or eliminate the need for earthen pits; however, notwithstanding the foregoing, where appropriate, and subject to prior County approval, the County generally supports: 1) the use of unlined drilling pits when bentonite or a similar clay additive is used during the drilling process, and 2) the use of lined single- or multi-well water storage pits in order to minimize the transport of water and promote recycling, subject to the requirements set forth in this subsection. Permitted modified closed-loop systems include oil and gas wells where air or fresh water is used to drill through the surface casing interval, defined as fifty (50) feet below the depth of the deepest aquifer, and a closed loop system is used for the remainder of the drilling and/or completion or recompletion procedures. Multi-well pits are defined as lined, engineered pits, constructed over an engineered base, with construction or liner specifications meeting or exceeding Commission pit lining rules, that will serve the functions of drilling, completion, and/or flowback pits for more than one well. b. Water Storage Pits to Contain Fresh Water or Brine Water: Water stored in pits approved by the County and allowed under Commission Rules, must meet the definition of fresh water or brine water, except for water stored in pits listed in 2c below. Fresh water is defined as containing total dissolved solids (TDS) less than or equal to 5,000 milligrams/liter (mg/l). Brine water is defined as water produced from an oil and/or gas well with TDS of greater than 5,000 mg/l. The Operator is required to remove all free and visible oil within 24 hours of discovery. Upon closure of the pit, the Operator will ensure the protection of the public health and environment by following all Commission pit closure rules, including collecting analytical data to ensure compliance with state standards. As long as the pit is open and containing fluid, a representative water sample shall be taken every six months from the surface of the pit fluids, the first sample to be taken within 6 months of the pit becoming operational. Water quality data will also include an analysis of Sodium Adsorption Ratio (SAR). The County will review water quality data provided by the Operator every six (6) months. TDS, pH, and specific conductance can be measured with a field meter. TEPH (total extractable petroleum hydrocarbons), BTEX (Benzene, Toluene, Ethylbenzene, and Xylenes), and SAR will be analyzed by an accredited laboratory. If the presence of TEPH and/or BTEX is indicated after County review and/or inspection, other water quality analyses may be required by the County. c. Additional Pits that Require County Review and Approval: Skimming, settling, percolation, evaporation, and any type of netted pits are generally discouraged by the County; however such pits may be approved on a case-by-case basis through the Use by Special Review ("USR") process. A copy of the Pit Plan submitted to the Commission will be provided to the County at the same time as the plans are submitted to the Commission. Construction of these pits will be preceded by collection of “baseline” soil samples from the center of the planned pit at 6 and 18 inches depth. Soil samples will be analyzed for pH, Sodium Adsorption Ratio (SAR), and Electrical Conductivity (EC). The Operator shall stake and photograph from the center of the planned pit (toward north, south, east, and west directions) for inclusion in the County’s copy of the Pit Plan. Upon closure of these pits, pH, SAR, EC, BTEX (Benzene, Toluene, Ethylbenzene, and Xylenes), and TEPH (total extractable petroleum hydrocarbons) analyses may be required if there is evidence of leaks or spills in the immediate area of the pits. d. Pits That Do Not Require County Approval: Flare, Emergency, Plugging, and Workover pits will not require county review or approval prior to construction (unless within 1/4 mile of a residence as set forth below); however, the County will be copied on the notification(s) sent to the Commission and any pit plans, remediation plans, or analytical results submitted to the Commission. e. Pit Setbacks: All pit construction within ¼ mile of a residence or water well is generally discouraged by the County and may have additional County requirements, such as fencing. Such pits will be reviewed on a case-by-case basis by the County. f. Multi-Well Pits: In additi
Drilling/Completion OperationsForm: (02 )
400541892
4/13/2014
Open hole resistivity log with gamma ray will be run on the vertical portion of this well to describe the stratigraphy of the vertical section of the wellbore and to adequately verify the setting depth of the surface casing and aquifer coverage.