Engineer | Form: (02 ) 2591941 3/16/2011 | PRIOR TO RECOMPLETION, OPERATOR MUST:
1) PROVIDE 24 HOUR NOTICE OF MIRU TO JIM PRECUP AT 303-469-1902 OR E-MAIL AT JIM.PRECUP@STATE.CO.US.
2) MONITOR THE BRADENHEAD DURING WELL STIMULATION PER RULE 341.
3) UPON WELL RECOMPLETION OPERATOR SHALL FILE A COGCC FORM 5A, INTERVAL REPORT REFLECTING THE NEW PERFORATIONS. |
Permit | Form: (02 ) 2591941 4/6/2011 | Review of area confirms it is not high density. |
Engineer | Form: (06 ) 402281498 1/14/2020 | Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare. |
Engineer | Form: (06 ) 402281498 1/14/2020 | 1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) Prior to placing the 1550' plug: verify that all fluid migration (liquid or gas) has been eliminated. If evidence of fluid migration or pressure remains, contact COGCC Engineer for an update to plugging orders.
3) After isolation has been verified, pump plug and displace. If cement is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at 190' or shallower and provide 10 sack plug at surface.
4) Leave at least 100’ of cement in the wellbore for each plug.
5) Properly abandon on-location flowlines as per Rule 1105. File electronic Form 42 once abandonment is complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line, the operator must submit a Flowline Report, Form 44.
6) With the Form 6 SRA operator must provide written documentation which positively affirms each COA has been addressed.
7) After placing the shallowest hydrocarbon isolating plug (7270'), operator must wait a sufficient time to confirm static conditions. If at any time after placing this plug there is evidence of pressure or of fluid migration, contact COGCC engineering before continuing operations. |
Engineer | Form: (06 ) 402281498 1/14/2020 | If there has not been a reported Bradenhead test within 60 days of plugging this well, prior to starting plugging operations, a Bradenhead test shall be performed.
1) If, before opening the Bradenhead valve, the beginning pressure is greater than 25
psi, sampling is required, and the COGCC engineering staff must be contacted.
2) If pressure remains at the conclusion of the test, or if any liquids were present during
the test, sampling is required.
3) If sampling is required contact COGCC engineering for a confirmation of plugging
requirements prior to placing any plugs.
Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting
Instructions.
The Form 17 shall be submitted within 10 days of the test. |
Engineer | Form: (06 ) 402281498 1/14/2020 | Changed TOC on 1/2 in 1/2 out plug from 1300' to 0'. Adjusted cement to 500 sacks. Operator to adjust accordingly. Updated WBD to be submitted with Form 6 SROA Operator concurs. |