OGLA | Form: (04 ) 403983245 11/8/2024 | Operator committed to the following Best Management Practices in the attached email of the CPW consultation: Operations will not extend into the water channel. Standard Stormwater/SPCC protocols will be followed. |
OGLA | Form: (04 ) 403983245 11/8/2024 | This oil and gas location is located within a CPW-mapped 500 foot buffer of a Ordinary High Water Mark for protection of Aquatic Native Species Conservation Water High Priority Habitat. At a minimum, Operator will review the stormwater program and implement stormwater BMPs and erosion control measures as needed to prevent fine-grained sediment and impacted stormwater runoff from entering surface water. |
Engineer | Form: (04 ) 403983245 11/11/2024 | 1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations.
2) Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare. |